Comoros vs Panama: Dealing with construction permits: Time

Comoros
107 days
in 2019
Panama
105 days
in 2019
Comoros rank
128th
Panama rank
130th

Dealing with construction permits: Time over time

  • Comoros
  • Panama
050100150200520122019

How they compare

Comoros currently reports 107 days against 105 days in Panama, a difference of 2 days.

The two have swapped places 1 time across 15 shared years of data; in 2005 it was Panama ahead.

Comoros ranks 128th and Panama ranks 130th of 185 countries.

Panama has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Comoros Panama Difference Ahead
2000s 107 days 141.2 days 34.2 days Panama
2010s 107 days 107.8 days 0.8 days Panama

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Comoros or Panama?
Comoros, at 107 days against 105 days in Panama as of 2019.
What is the difference in dealing with construction permits: time between Comoros and Panama?
2 days, with Comoros ahead.
How many years of comparable data are there for Comoros and Panama?
15 years are reported by both, from 2005 to 2019.
How do Comoros and Panama rank globally for dealing with construction permits: time?
Comoros ranks 128th and Panama ranks 130th of 185 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.