Democratic Republic of Congo vs Pakistan: Dealing with construction permits: Time
Dealing with construction permits: Time over time
- Democratic Republic of Congo
- Pakistan
How they compare
Pakistan currently reports 124.9 days against 122 days in Democratic Republic of Congo, a difference of 2.9 days.
Across all 15 years both countries report, Pakistan has been ahead every year.
Democratic Republic of Congo ranks 110th and Pakistan ranks 107th of 185 countries.
Pakistan has averaged higher in every one of the 2 decades both report.
Head to head by decade
| Decade | Democratic Republic of Congo | Pakistan | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 239 days | 276.2 days | 37.2 days | Pakistan |
| 2010s | 126.4 days | 263.86 days | 137.46 days | Pakistan |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher dealing with construction permits: time, Democratic Republic of Congo or Pakistan?
- Pakistan, at 124.9 days against 122 days in Democratic Republic of Congo as of 2019.
- What is the difference in dealing with construction permits: time between Democratic Republic of Congo and Pakistan?
- 2.9 days, with Pakistan ahead.
- How many years of comparable data are there for Democratic Republic of Congo and Pakistan?
- 15 years are reported by both, from 2005 to 2019.
- How do Democratic Republic of Congo and Pakistan rank globally for dealing with construction permits: time?
- Democratic Republic of Congo ranks 110th and Pakistan ranks 107th of 185 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.