Democratic Republic of Congo vs Vanuatu: Dealing with construction permits: Time (days) (Time days)

Democratic Republic of Congo
122 days
in 2019
Vanuatu
123 days
in 2019
Democratic Republic of Congo rank
113th
Vanuatu rank
112th

Dealing with construction permits: Time (days) (Time days) over time

  • Democratic Republic of Congo
  • Vanuatu
50100150200250200520122019

How they compare

Vanuatu currently reports 123 days against 122 days in Democratic Republic of Congo, a difference of 1 days.

The two have swapped places 3 times across 15 shared years of data; in 2005 it was Democratic Republic of Congo ahead.

Democratic Republic of Congo ranks 113th and Vanuatu ranks 112th of 188 countries.

Democratic Republic of Congo has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Democratic Republic of Congo Vanuatu Difference Ahead
2000s 239 days 59 days 180 days Democratic Republic of Congo
2010s 126.4 days 114.5 days 11.9 days Democratic Republic of Congo

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Democratic Republic of Congo or Vanuatu?
Vanuatu, at 123 days against 122 days in Democratic Republic of Congo as of 2019.
What is the difference in dealing with construction permits: time between Democratic Republic of Congo and Vanuatu?
1 days, with Vanuatu ahead.
How many years of comparable data are there for Democratic Republic of Congo and Vanuatu?
15 years are reported by both, from 2005 to 2019.
How do Democratic Republic of Congo and Vanuatu rank globally for dealing with construction permits: time?
Democratic Republic of Congo ranks 113th and Vanuatu ranks 112th of 188 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Democratic Republic of Congo vs Vanuatu: Dealing with construction permits: Time. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-time-days/congo-dem-rep/vanuatu/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-time-days/congo-dem-rep/vanuatu/">Democratic Republic of Congo vs Vanuatu: Dealing with construction permits: Time</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.