Congo, Rep. vs Viet Nam: Dealing with construction permits: Time

Congo, Rep.
164 days
in 2019
Viet Nam
166 days
in 2019
Congo, Rep. rank
66th
Viet Nam rank
63rd

Dealing with construction permits: Time over time

  • Congo, Rep.
  • Viet Nam
050100150200200520122019

How they compare

Viet Nam currently reports 166 days against 164 days in Congo, Rep., a difference of 2 days.

The two have swapped places 1 time across 15 shared years of data; in 2005 it was Congo, Rep. ahead.

Congo, Rep. ranks 66th and Viet Nam ranks 63rd of 185 countries.

Congo, Rep. has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Congo, Rep. Viet Nam Difference Ahead
2000s 179 days 166 days 13 days Congo, Rep.
2010s 168.5 days 166 days 2.5 days Congo, Rep.

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Congo, Rep. or Viet Nam?
Viet Nam, at 166 days against 164 days in Congo, Rep. as of 2019.
What is the difference in dealing with construction permits: time between Congo, Rep. and Viet Nam?
2 days, with Viet Nam ahead.
How many years of comparable data are there for Congo, Rep. and Viet Nam?
15 years are reported by both, from 2005 to 2019.
How do Congo, Rep. and Viet Nam rank globally for dealing with construction permits: time?
Congo, Rep. ranks 66th and Viet Nam ranks 63rd of 185 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.