Congo vs Vietnam: Dealing with construction permits: Time (days) (Time days)

Congo
164 days
in 2019
Vietnam
166 days
in 2019
Congo rank
68th
Vietnam rank
65th

Dealing with construction permits: Time (days) (Time days) over time

  • Congo
  • Vietnam
050100150200200520122019

How they compare

Vietnam currently reports 166 days against 164 days in Congo, a difference of 2 days.

The two have swapped places 1 time across 15 shared years of data; in 2005 it was Congo ahead.

Congo ranks 68th and Vietnam ranks 65th of 188 countries.

Congo has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Congo Vietnam Difference Ahead
2000s 179 days 166 days 13 days Congo
2010s 168.5 days 166 days 2.5 days Congo

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Congo or Vietnam?
Vietnam, at 166 days against 164 days in Congo as of 2019.
What is the difference in dealing with construction permits: time between Congo and Vietnam?
2 days, with Vietnam ahead.
How many years of comparable data are there for Congo and Vietnam?
15 years are reported by both, from 2005 to 2019.
How do Congo and Vietnam rank globally for dealing with construction permits: time?
Congo ranks 68th and Vietnam ranks 65th of 188 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Congo vs Vietnam: Dealing with construction permits: Time. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-time-days/congo-rep/viet-nam/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-time-days/congo-rep/viet-nam/">Congo vs Vietnam: Dealing with construction permits: Time</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.