Costa Rica vs Jamaica: Dealing with construction permits: Time
Dealing with construction permits: Time over time
- Costa Rica
- Jamaica
How they compare
Jamaica currently reports 140.5 days against 138 days in Costa Rica, a difference of 2.5 days.
The two have swapped places 2 times across 15 shared years of data; in 2005 it was Jamaica ahead.
Costa Rica ranks 94th and Jamaica ranks 92nd of 187 countries.
Jamaica has averaged higher in every one of the 2 decades both report.
Head to head by decade
| Decade | Costa Rica | Jamaica | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 199 days | 228 days | 29 days | Jamaica |
| 2010s | 152.2 days | 159.55 days | 7.35 days | Jamaica |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher dealing with construction permits: time, Costa Rica or Jamaica?
- Jamaica, at 140.5 days against 138 days in Costa Rica as of 2019.
- What is the difference in dealing with construction permits: time between Costa Rica and Jamaica?
- 2.5 days, with Jamaica ahead.
- How many years of comparable data are there for Costa Rica and Jamaica?
- 15 years are reported by both, from 2005 to 2019.
- How do Costa Rica and Jamaica rank globally for dealing with construction permits: time?
- Costa Rica ranks 94th and Jamaica ranks 92nd of 187 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.