Dealing with construction permits: Time (days) (Time days) in Costa Rica

Costa Rica: Dealing with construction permits: Time was 138 days in 2019. ▼ Falling

Latest (2019)
138 days
Change on year
unchanged
World rank
95th
of 188 countries
All-time high
202 days
in 2008
All-time low
138 days
in 2013
Years of data
15
2005–2019

Dealing with construction permits: Time in Costa Rica, 2005–2019

0501001502002005201220192005: 197 days2006: 197 days2007: 197 days2008: 202 days2009: 202 days2010: 202 days2011: 202 days2012: 152 days2013: 138 days2014: 138 days2015: 138 days2016: 138 days2017: 138 days2018: 138 days2019: 138 days

Source: World Bank. Measured in days.

Analysis

Costa Rica recorded 138 days for dealing with construction permits: time in 2019. That is the lowest value across all 15 years on record.

That represents a change of down 31.7% over ten years.

Over the whole period, dealing with construction permits: time in Costa Rica peaked at 202 days in 2008 and was at its lowest, 138 days, in 2013.

Costa Rica ranks 95th of 188 countries on this measure, in the middle of the range.

The long-run direction has been consistently falling across the 15 years of available data.

Dealing with construction permits: Time in Costa Rica, year by year

Annual values for Dealing with construction permits: Time (days) in Costa Rica, 2005 to 2019.
Year days Change
2005 197 days —
2006 197 days +0.0%
2007 197 days +0.0%
2008 202 days +2.5%
2009 202 days +0.0%
2010 202 days +0.0%
2011 202 days +0.0%
2012 152 days -24.8%
2013 138 days -9.2%
2014 138 days +0.0%
2015 138 days +0.0%
2016 138 days +0.0%
2017 138 days +0.0%
2018 138 days +0.0%
2019 138 days +0.0%

Costa Rica compared with similar countries

  • Costa Rica's 138 days is below the median for high income countries, which is 144.75 days, 95% of the median. (62 countries reporting)
  • Costa Rica's 138 days is below the median for Latin America & Caribbean, which is 165 days, 84% of the median. (33 countries reporting)

Averages by decade

DecadeAverage LowestHighest Years
2000s 199 days 197 days 202 days 5
2010s 152.2 days 138 days 202 days 10

Countries ranked near Costa Rica

  1. 92 Fiji 141 days compare
  2. 93 Jamaica 140.5 days compare
  3. 94 Maldives 140 days compare
  4. 96 Mongolia 137 days compare
  5. 96 Peru 137 days compare
  6. 96 Poland 137 days compare

See the full ranking of 188 places →

More private sector data for Costa Rica

All data for Costa Rica →

Frequently asked questions

What is dealing with construction permits: time in Costa Rica?
Dealing with construction permits: time in Costa Rica was 138 days in 2019, according to the World Bank.
What is the highest dealing with construction permits: time recorded in Costa Rica?
The highest recorded value was 202 days in 2008.
What is the lowest dealing with construction permits: time recorded in Costa Rica?
The lowest recorded value was 138 days in 2013.
How does Costa Rica rank for dealing with construction permits: time?
Costa Rica ranks 95th out of 188 countries with data for 2019.
Is dealing with construction permits: time rising or falling in Costa Rica?
Over the last ten years it is down 31.7%. The long-run trend across the full record is falling.
Where does this Costa Rica data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Dealing with construction permits: Time in Costa Rica. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/stat/dealing-with-construction-permits-time-days/costa-rica/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/dealing-with-construction-permits-time-days/costa-rica/">Dealing with construction permits: Time in Costa Rica</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.