Costa Rica vs Mongolia: Dealing with construction permits: Time

Costa Rica
138 days
in 2019
Mongolia
137 days
in 2019
Costa Rica rank
92nd
Mongolia rank
93rd

Dealing with construction permits: Time over time

  • Costa Rica
  • Mongolia
050100150200200520122019

How they compare

Costa Rica currently reports 138 days against 137 days in Mongolia, a difference of 1 days.

The two have swapped places 1 time across 15 shared years of data; in 2005 it was Mongolia ahead.

Costa Rica ranks 92nd and Mongolia ranks 93rd of 185 countries.

Mongolia has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Costa Rica Mongolia Difference Ahead
2000s 199 days 218 days 19 days Mongolia
2010s 152.2 days 155 days 2.8 days Mongolia

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Costa Rica or Mongolia?
Costa Rica, at 138 days against 137 days in Mongolia as of 2019.
What is the difference in dealing with construction permits: time between Costa Rica and Mongolia?
1 days, with Costa Rica ahead.
How many years of comparable data are there for Costa Rica and Mongolia?
15 years are reported by both, from 2005 to 2019.
How do Costa Rica and Mongolia rank globally for dealing with construction permits: time?
Costa Rica ranks 92nd and Mongolia ranks 93rd of 185 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.