Dealing with construction permits: Time (days) (Time days) in Mongolia

Mongolia: Dealing with construction permits: Time was 137 days in 2019. ▼ Falling

Latest (2019)
137 days
Change on year
unchanged
World rank
96th
of 188 countries
All-time high
218 days
in 2005
All-time low
137 days
in 2013
Years of data
15
2005–2019

Dealing with construction permits: Time in Mongolia, 2005–2019

0501001502002005201220192005: 218 days2006: 218 days2007: 218 days2008: 218 days2009: 218 days2010: 204 days2011: 204 days2012: 183 days2013: 137 days2014: 137 days2015: 137 days2016: 137 days2017: 137 days2018: 137 days2019: 137 days

Source: World Bank. Measured in days.

Analysis

Mongolia recorded 137 days for dealing with construction permits: time in 2019. That is the lowest value across all 15 years on record.

That represents a change of down 37.2% over ten years.

Over the whole period, dealing with construction permits: time in Mongolia peaked at 218 days in 2005 and was at its lowest, 137 days, in 2013.

Mongolia ranks 96th of 188 countries on this measure, in the middle of the range.

The long-run direction has been consistently falling across the 15 years of available data.

Dealing with construction permits: Time in Mongolia, year by year

Annual values for Dealing with construction permits: Time (days) in Mongolia, 2005 to 2019.
Year days Change
2005 218 days —
2006 218 days +0.0%
2007 218 days +0.0%
2008 218 days +0.0%
2009 218 days +0.0%
2010 204 days -6.4%
2011 204 days +0.0%
2012 183 days -10.3%
2013 137 days -25.1%
2014 137 days +0.0%
2015 137 days +0.0%
2016 137 days +0.0%
2017 137 days +0.0%
2018 137 days +0.0%
2019 137 days +0.0%

Mongolia compared with similar countries

  • Mongolia's 137 days is above the median for upper middle income countries, which is 131 days, 1.0× the median. (55 countries reporting)
  • Mongolia's 137 days is above the median for East Asia & Pacific, which is 103.67 days, 1.3× the median. (28 countries reporting)

Averages by decade

DecadeAverage LowestHighest Years
2000s 218 days 218 days 218 days 5
2010s 155 days 137 days 204 days 10

Countries ranked near Mongolia

  1. 93 Jamaica 140.5 days compare
  2. 94 Maldives 140 days compare
  3. 95 Costa Rica 138 days compare
  4. 96 Peru 137 days compare
  5. 96 Poland 137 days compare
  6. 99 Ethiopia 136 days compare

See the full ranking of 188 places →

More private sector data for Mongolia

All data for Mongolia →

Frequently asked questions

What is dealing with construction permits: time in Mongolia?
Dealing with construction permits: time in Mongolia was 137 days in 2019, according to the World Bank.
What is the highest dealing with construction permits: time recorded in Mongolia?
The highest recorded value was 218 days in 2005.
What is the lowest dealing with construction permits: time recorded in Mongolia?
The lowest recorded value was 137 days in 2013.
How does Mongolia rank for dealing with construction permits: time?
Mongolia ranks 96th out of 188 countries with data for 2019.
Is dealing with construction permits: time rising or falling in Mongolia?
Over the last ten years it is down 37.2%. The long-run trend across the full record is falling.
Where does this Mongolia data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Dealing with construction permits: Time in Mongolia. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/stat/dealing-with-construction-permits-time-days/mongolia/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/dealing-with-construction-permits-time-days/mongolia/">Dealing with construction permits: Time in Mongolia</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.