Cote d'Ivoire vs Namibia: Dealing with construction permits: Time

Cote d'Ivoire
163 days
in 2019
Namibia
160 days
in 2019
Cote d'Ivoire rank
68th
Namibia rank
70th

Dealing with construction permits: Time over time

  • Cote d'Ivoire
  • Namibia
100200300400500600200520122019

How they compare

Cote d'Ivoire currently reports 163 days against 160 days in Namibia, a difference of 3 days.

Across all 15 years both countries report, Cote d'Ivoire has been ahead every year.

Cote d'Ivoire ranks 68th and Namibia ranks 70th of 185 countries.

Cote d'Ivoire has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Cote d'Ivoire Namibia Difference Ahead
2000s 624.2 days 145 days 479.2 days Cote d'Ivoire
2010s 372.1 days 152.5 days 219.6 days Cote d'Ivoire

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Cote d'Ivoire or Namibia?
Cote d'Ivoire, at 163 days against 160 days in Namibia as of 2019.
What is the difference in dealing with construction permits: time between Cote d'Ivoire and Namibia?
3 days, with Cote d'Ivoire ahead.
How many years of comparable data are there for Cote d'Ivoire and Namibia?
15 years are reported by both, from 2005 to 2019.
How do Cote d'Ivoire and Namibia rank globally for dealing with construction permits: time?
Cote d'Ivoire ranks 68th and Namibia ranks 70th of 185 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.