Dealing with construction permits: Time in Cote d'Ivoire

Cote d'Ivoire: Dealing with construction permits: Time was 163 days in 2019. ▼ Falling

Latest (2019)
163 days
Change on year
unchanged
World rank
68th
of 185 countries
All-time high
625 days
in 2009
All-time low
163 days
in 2017
Years of data
15
2005–2019

Dealing with construction permits: Time in Cote d'Ivoire, 2005–2019

2003004005006002005201220192005: 624 days2006: 624 days2007: 624 days2008: 624 days2009: 625 days2010: 565 days2011: 565 days2012: 550 days2013: 433 days2014: 373 days2015: 373 days2016: 373 days2017: 163 days2018: 163 days2019: 163 days

Source: World Bank. Measured in days.

Analysis

Cote d'Ivoire recorded 163 days for dealing with construction permits: time in 2019. That is the lowest value across all 15 years on record.

That represents a change of down 73.9% over ten years.

Over the whole period, dealing with construction permits: time in Cote d'Ivoire peaked at 625 days in 2009 and was at its lowest, 163 days, in 2017.

Cote d'Ivoire ranks 68th of 185 countries on this measure, in the middle of the range.

The long-run direction has been consistently falling across the 15 years of available data.

Averages by decade

DecadeAverage LowestHighest Years
2000s 624.2 days 624 days 625 days 5
2010s 372.1 days 163 days 565 days 10

Countries ranked near Cote d'Ivoire

  1. 65 Russia 164.5 days compare
  2. 66 Congo 164 days compare
  3. 66 Ireland 164 days compare
  4. 69 Netherlands 161 days compare
  5. 70 Namibia 160 days compare
  6. 70 Portugal 160 days compare

See the full ranking of 187 places →

More private sector data for Cote d'Ivoire

All data for Cote d'Ivoire →

Frequently asked questions

What is dealing with construction permits: time in Cote d'Ivoire?
Dealing with construction permits: time in Cote d'Ivoire was 163 days in 2019, according to the World Bank.
What is the highest dealing with construction permits: time recorded in Cote d'Ivoire?
The highest recorded value was 625 days in 2009.
What is the lowest dealing with construction permits: time recorded in Cote d'Ivoire?
The lowest recorded value was 163 days in 2017.
How does Cote d'Ivoire rank for dealing with construction permits: time?
Cote d'Ivoire ranks 68th out of 185 countries with data for 2019.
Is dealing with construction permits: time rising or falling in Cote d'Ivoire?
Over the last ten years it is down 73.9%. The long-run trend across the full record is falling.
Where does this Cote d'Ivoire data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.