Dealing with construction permits: Time in Namibia

Namibia: Dealing with construction permits: Time was 160 days in 2019. ▲ Rising

Latest (2019)
160 days
Change on year
unchanged
World rank
70th
of 185 countries
All-time high
160 days
in 2015
All-time low
145 days
in 2005
Years of data
15
2005–2019

Dealing with construction permits: Time in Namibia, 2005–2019

0501001502005201220192005: 145 days2006: 145 days2007: 145 days2008: 145 days2009: 145 days2010: 145 days2011: 145 days2012: 145 days2013: 145 days2014: 145 days2015: 160 days2016: 160 days2017: 160 days2018: 160 days2019: 160 days

Source: World Bank. Measured in days.

Analysis

In 2019, dealing with construction permits: time in Namibia stood at 160 days. That is the highest value across all 15 years on record.

Compared with earlier readings it is up 10.3% over ten years.

Over the whole period, dealing with construction permits: time in Namibia peaked at 160 days in 2015 and was at its lowest, 145 days, in 2005.

Namibia ranks 70th of 185 countries on this measure, in the middle of the range.

The long-run direction has been consistently rising across the 15 years of available data.

Averages by decade

DecadeAverage LowestHighest Years
2000s 145 days 145 days 145 days 5
2010s 152.5 days 145 days 160 days 10

Countries ranked near Namibia

  1. 68 Cote d'Ivoire 163 days compare
  2. 69 Netherlands 161 days compare
  3. 70 Portugal 160 days compare
  4. 72 Kenya 159 days compare
  5. 73 Belarus 158 days compare

See the full ranking of 187 places →

More private sector data for Namibia

All data for Namibia →

Frequently asked questions

What is dealing with construction permits: time in Namibia?
Dealing with construction permits: time in Namibia was 160 days in 2019, according to the World Bank.
What is the highest dealing with construction permits: time recorded in Namibia?
The highest recorded value was 160 days in 2015.
What is the lowest dealing with construction permits: time recorded in Namibia?
The lowest recorded value was 145 days in 2005.
How does Namibia rank for dealing with construction permits: time?
Namibia ranks 70th out of 185 countries with data for 2019.
Is dealing with construction permits: time rising or falling in Namibia?
Over the last ten years it is up 10.3%. The long-run trend across the full record is rising.
Where does this Namibia data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.