Croatia vs Grenada: Dealing with construction permits: Time

Croatia
146 days
in 2019
Grenada
146 days
in 2019
Croatia rank
82nd
Grenada rank
82nd

Dealing with construction permits: Time over time

  • Croatia
  • Grenada
100200300400500200520122019

How they compare

Croatia currently reports 146 days against 146 days in Grenada, a difference of 0 days.

The two have swapped places 1 time across 15 shared years of data; in 2005 it was Croatia ahead.

Croatia ranks 82nd and Grenada ranks 82nd of 185 countries.

Croatia has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Croatia Grenada Difference Ahead
2000s 401.6 days 146 days 255.6 days Croatia
2010s 227.6 days 146 days 81.6 days Croatia

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Croatia or Grenada?
Croatia, at 146 days against 146 days in Grenada as of 2019.
What is the difference in dealing with construction permits: time between Croatia and Grenada?
0 days, with Croatia ahead.
How many years of comparable data are there for Croatia and Grenada?
15 years are reported by both, from 2005 to 2019.
How do Croatia and Grenada rank globally for dealing with construction permits: time?
Croatia ranks 82nd and Grenada ranks 82nd of 185 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.