Dealing with construction permits: Time in Grenada

Grenada: Dealing with construction permits: Time was 146 days in 2019. ▬ Flat

Latest (2019)
146 days
Change on year
unchanged
World rank
82nd
of 185 countries
All-time high
146 days
in 2005
All-time low
146 days
in 2005
Years of data
15
2005–2019

Dealing with construction permits: Time in Grenada, 2005–2019

0501001502005201220192005: 146 days2006: 146 days2007: 146 days2008: 146 days2009: 146 days2010: 146 days2011: 146 days2012: 146 days2013: 146 days2014: 146 days2015: 146 days2016: 146 days2017: 146 days2018: 146 days2019: 146 days

Source: World Bank. Measured in days.

Analysis

In 2019, dealing with construction permits: time in Grenada stood at 146 days. That is the highest value across all 15 years on record.

Compared with earlier readings it is unchanged over ten years.

Over the whole period, dealing with construction permits: time in Grenada peaked at 146 days in 2005 and was at its lowest, 146 days, in 2005.

That places Grenada 82nd out of 185 countries with data for 2019, putting it in the middle of the range.

Averages by decade

DecadeAverage LowestHighest Years
2000s 146 days 146 days 146 days 5
2010s 146 days 146 days 146 days 10

Countries ranked near Grenada

  1. 79 Guinea 151 days compare
  2. 80 Bhutan 150 days compare
  3. 81 Spain 147 days compare
  4. 82 Croatia 146 days compare
  5. 84 San Marino 145.5 days compare
  6. 85 Antigua and Barbuda 144 days compare
  7. 85 Equatorial Guinea 144 days compare

See the full ranking of 187 places →

More private sector data for Grenada

All data for Grenada →

Frequently asked questions

What is dealing with construction permits: time in Grenada?
Dealing with construction permits: time in Grenada was 146 days in 2019, according to the World Bank.
What is the highest dealing with construction permits: time recorded in Grenada?
The highest recorded value was 146 days in 2005.
What is the lowest dealing with construction permits: time recorded in Grenada?
The lowest recorded value was 146 days in 2005.
How does Grenada rank for dealing with construction permits: time?
Grenada ranks 82nd out of 185 countries with data for 2019.
Is dealing with construction permits: time rising or falling in Grenada?
Over the last ten years it is unchanged. The long-run trend across the full record is flat.
Where does this Grenada data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.