Dealing with construction permits: Time in Grenada
Grenada: Dealing with construction permits: Time was 146 days in 2019. ▬ Flat
Dealing with construction permits: Time in Grenada, 2005–2019
Source: World Bank. Measured in days.
Analysis
In 2019, dealing with construction permits: time in Grenada stood at 146 days. That is the highest value across all 15 years on record.
Compared with earlier readings it is unchanged over ten years.
Over the whole period, dealing with construction permits: time in Grenada peaked at 146 days in 2005 and was at its lowest, 146 days, in 2005.
That places Grenada 82nd out of 185 countries with data for 2019, putting it in the middle of the range.
Averages by decade
| Decade | Average | Lowest | Highest | Years |
|---|---|---|---|---|
| 2000s | 146 days | 146 days | 146 days | 5 |
| 2010s | 146 days | 146 days | 146 days | 10 |
Countries ranked near Grenada
- 79 Guinea 151 days compare
- 80 Bhutan 150 days compare
- 81 Spain 147 days compare
- 82 Croatia 146 days compare
- 84 San Marino 145.5 days compare
- 85 Antigua and Barbuda 144 days compare
- 85 Equatorial Guinea 144 days compare
More private sector data for Grenada
- Merchandise trade 48.4% (2025)
- Food imports 24.2% (2024)
- Manufactures imports 56.2% (2024)
- Merchandise imports 653.00 million current US$ (2025)
- Food exports 69.1% (2024)
- Manufactures exports 28.6% (2024)
- Merchandise exports 35.00 million current US$ (2025)
- Commercial service exports 754.40 million current US$ (2025)
- Transport services 25.0% (2025)
- Computer, communications and other services 58.6% (2025)
Frequently asked questions
- What is dealing with construction permits: time in Grenada?
- Dealing with construction permits: time in Grenada was 146 days in 2019, according to the World Bank.
- What is the highest dealing with construction permits: time recorded in Grenada?
- The highest recorded value was 146 days in 2005.
- What is the lowest dealing with construction permits: time recorded in Grenada?
- The lowest recorded value was 146 days in 2005.
- How does Grenada rank for dealing with construction permits: time?
- Grenada ranks 82nd out of 185 countries with data for 2019.
- Is dealing with construction permits: time rising or falling in Grenada?
- Over the last ten years it is unchanged. The long-run trend across the full record is flat.
- Where does this Grenada data come from?
- The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.
Download this data
CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).
About this data
The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.