Dealing with construction permits: Time (days) (Time days) in Grenada

Grenada: Dealing with construction permits: Time was 146 days in 2019. ▬ Flat

Latest (2019)
146 days
Change on year
unchanged
World rank
84th
of 188 countries
All-time high
146 days
in 2005
All-time low
146 days
in 2005
Years of data
15
2005–2019

Dealing with construction permits: Time in Grenada, 2005–2019

0501001502005201220192005: 146 days2006: 146 days2007: 146 days2008: 146 days2009: 146 days2010: 146 days2011: 146 days2012: 146 days2013: 146 days2014: 146 days2015: 146 days2016: 146 days2017: 146 days2018: 146 days2019: 146 days

Source: World Bank. Measured in days.

Analysis

In 2019, dealing with construction permits: time in Grenada stood at 146 days. That is the highest value across all 15 years on record.

Compared with earlier readings it is unchanged over ten years.

Over the whole period, dealing with construction permits: time in Grenada peaked at 146 days in 2005 and was at its lowest, 146 days, in 2005.

That places Grenada 84th out of 188 countries with data for 2019, putting it in the middle of the range.

Dealing with construction permits: Time in Grenada, year by year

Annual values for Dealing with construction permits: Time (days) in Grenada, 2005 to 2019.
Year days Change
2005 146 days —
2006 146 days +0.0%
2007 146 days +0.0%
2008 146 days +0.0%
2009 146 days +0.0%
2010 146 days +0.0%
2011 146 days +0.0%
2012 146 days +0.0%
2013 146 days +0.0%
2014 146 days +0.0%
2015 146 days +0.0%
2016 146 days +0.0%
2017 146 days +0.0%
2018 146 days +0.0%
2019 146 days +0.0%

Grenada compared with similar countries

  • Grenada's 146 days is above the median for upper middle income countries, which is 131 days, 1.1× the median. (55 countries reporting)
  • Grenada's 146 days is below the median for Latin America & Caribbean, which is 165 days, 88% of the median. (33 countries reporting)

Averages by decade

DecadeAverage LowestHighest Years
2000s 146 days 146 days 146 days 5
2010s 146 days 146 days 146 days 10

Countries ranked near Grenada

  1. 81 Guinea 151 days compare
  2. 82 Bhutan 150 days compare
  3. 83 Spain 147 days compare
  4. 84 Croatia 146 days compare
  5. 84 Djibouti 146 days compare
  6. 87 San Marino 145.5 days compare

See the full ranking of 188 places →

More private sector data for Grenada

All data for Grenada →

Frequently asked questions

What is dealing with construction permits: time in Grenada?
Dealing with construction permits: time in Grenada was 146 days in 2019, according to the World Bank.
What is the highest dealing with construction permits: time recorded in Grenada?
The highest recorded value was 146 days in 2005.
What is the lowest dealing with construction permits: time recorded in Grenada?
The lowest recorded value was 146 days in 2005.
How does Grenada rank for dealing with construction permits: time?
Grenada ranks 84th out of 188 countries with data for 2019.
Is dealing with construction permits: time rising or falling in Grenada?
Over the last ten years it is unchanged. The long-run trend across the full record is flat.
Where does this Grenada data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Dealing with construction permits: Time in Grenada. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/stat/dealing-with-construction-permits-time-days/grenada/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/dealing-with-construction-permits-time-days/grenada/">Dealing with construction permits: Time in Grenada</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.