Dealing with construction permits: Time in Croatia

Croatia: Dealing with construction permits: Time was 146 days in 2019. ▼ Falling

Latest (2019)
146 days
Change on year
unchanged
World rank
82nd
of 185 countries
All-time high
450 days
in 2009
All-time low
146 days
in 2014
Years of data
15
2005–2019

Dealing with construction permits: Time in Croatia, 2005–2019

1002003004005002005201220192005: 364 days2006: 364 days2007: 415 days2008: 415 days2009: 450 days2010: 350 days2011: 350 days2012: 350 days2013: 350 days2014: 146 days2015: 146 days2016: 146 days2017: 146 days2018: 146 days2019: 146 days

Source: World Bank. Measured in days.

Analysis

Croatia recorded 146 days for dealing with construction permits: time in 2019. That is the lowest value across all 15 years on record.

Compared with earlier readings it is down 67.6% over ten years.

Over the whole period, dealing with construction permits: time in Croatia peaked at 450 days in 2009 and was at its lowest, 146 days, in 2014.

Croatia ranks 82nd of 185 countries on this measure, in the middle of the range.

The long-run direction has been consistently falling across the 15 years of available data.

Averages by decade

DecadeAverage LowestHighest Years
2000s 401.6 days 364 days 450 days 5
2010s 227.6 days 146 days 350 days 10

Countries ranked near Croatia

  1. 79 Guinea 151 days compare
  2. 80 Bhutan 150 days compare
  3. 81 Spain 147 days compare
  4. 82 Grenada 146 days compare
  5. 84 San Marino 145.5 days compare
  6. 85 Antigua and Barbuda 144 days compare
  7. 85 Equatorial Guinea 144 days compare

See the full ranking of 187 places →

More private sector data for Croatia

All data for Croatia →

Frequently asked questions

What is dealing with construction permits: time in Croatia?
Dealing with construction permits: time in Croatia was 146 days in 2019, according to the World Bank.
What is the highest dealing with construction permits: time recorded in Croatia?
The highest recorded value was 450 days in 2009.
What is the lowest dealing with construction permits: time recorded in Croatia?
The lowest recorded value was 146 days in 2014.
How does Croatia rank for dealing with construction permits: time?
Croatia ranks 82nd out of 185 countries with data for 2019.
Is dealing with construction permits: time rising or falling in Croatia?
Over the last ten years it is down 67.6%. The long-run trend across the full record is falling.
Where does this Croatia data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.