Czechia vs Guatemala: Dealing with construction permits: Time
Dealing with construction permits: Time over time
- Czechia
- Guatemala
How they compare
Czechia currently reports 246 days against 226 days in Guatemala, a difference of 20 days.
That makes Czechia's figure about 1.1 times Guatemala's.
The two have swapped places 1 time across 15 shared years of data; in 2005 it was Guatemala ahead.
Czechia ranks 20th and Guatemala ranks 23rd of 185 countries.
Czechia has averaged higher in every one of the 2 decades both report.
Head to head by decade
| Decade | Czechia | Guatemala | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 270 days | 266.6 days | 3.4 days | Czechia |
| 2010s | 246 days | 182.9 days | 63.1 days | Czechia |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher dealing with construction permits: time, Czechia or Guatemala?
- Czechia, at 246 days against 226 days in Guatemala as of 2019.
- What is the difference in dealing with construction permits: time between Czechia and Guatemala?
- 20 days, with Czechia ahead.
- How many years of comparable data are there for Czechia and Guatemala?
- 15 years are reported by both, from 2005 to 2019.
- How do Czechia and Guatemala rank globally for dealing with construction permits: time?
- Czechia ranks 20th and Guatemala ranks 23rd of 185 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.