Dealing with construction permits: Time (days) (Time days) in Guatemala

Guatemala: Dealing with construction permits: Time was 226 days in 2019. ▼ Falling

Latest (2019)
226 days
Change on year
unchanged
World rank
25th
of 188 countries
All-time high
363 days
in 2005
All-time low
138 days
in 2013
Years of data
15
2005–2019

Dealing with construction permits: Time in Guatemala, 2005–2019

01002003004002005201220192005: 363 days2006: 303 days2007: 248 days2008: 228 days2009: 191 days2010: 191 days2011: 191 days2012: 184 days2013: 138 days2014: 138 days2015: 138 days2016: 168 days2017: 229 days2018: 226 days2019: 226 days

Source: World Bank. Measured in days.

Analysis

The most recent figure for dealing with construction permits: time in Guatemala is 226 days, measured in 2019.

That represents a change of up 18.3% over ten years.

Over the whole period, dealing with construction permits: time in Guatemala peaked at 363 days in 2005 and was at its lowest, 138 days, in 2013.

That places Guatemala 25th out of 188 countries with data for 2019, putting it in the top quarter.

The long-run direction has been consistently falling across the 15 years of available data.

Dealing with construction permits: Time in Guatemala, year by year

Annual values for Dealing with construction permits: Time (days) in Guatemala, 2005 to 2019.
Year days Change
2005 363 days —
2006 303 days -16.5%
2007 248 days -18.2%
2008 228 days -8.1%
2009 191 days -16.2%
2010 191 days +0.0%
2011 191 days +0.0%
2012 184 days -3.7%
2013 138 days -25.0%
2014 138 days +0.0%
2015 138 days +0.0%
2016 168 days +21.7%
2017 229 days +36.3%
2018 226 days -1.3%
2019 226 days +0.0%

Guatemala compared with similar countries

  • Guatemala's 226 days is above the median for upper middle income countries, which is 131 days, 1.7× the median. (55 countries reporting)
  • Guatemala's 226 days is above the median for Latin America & Caribbean, which is 165 days, 1.4× the median. (33 countries reporting)

Averages by decade

DecadeAverage LowestHighest Years
2000s 266.6 days 191 days 363 days 5
2010s 182.9 days 138 days 229 days 10

Countries ranked near Guatemala

  1. 22 Kosovo 237 days compare
  2. 22 Kosovo (UNSCR 1244) 237 days compare
  3. 24 Bolivia 235 days compare
  4. 25 Chad 226 days compare
  5. 27 Nicaragua 225 days compare
  6. 28 Suriname 223 days compare

See the full ranking of 188 places →

More private sector data for Guatemala

All data for Guatemala →

Frequently asked questions

What is dealing with construction permits: time in Guatemala?
Dealing with construction permits: time in Guatemala was 226 days in 2019, according to the World Bank.
What is the highest dealing with construction permits: time recorded in Guatemala?
The highest recorded value was 363 days in 2005.
What is the lowest dealing with construction permits: time recorded in Guatemala?
The lowest recorded value was 138 days in 2013.
How does Guatemala rank for dealing with construction permits: time?
Guatemala ranks 25th out of 188 countries with data for 2019.
Is dealing with construction permits: time rising or falling in Guatemala?
Over the last ten years it is up 18.3%. The long-run trend across the full record is falling.
Where does this Guatemala data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Dealing with construction permits: Time in Guatemala. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/stat/dealing-with-construction-permits-time-days/guatemala/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/dealing-with-construction-permits-time-days/guatemala/">Dealing with construction permits: Time in Guatemala</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.