Czechia vs Slovenia: Dealing with construction permits: Time
Dealing with construction permits: Time over time
- Czechia
- Slovenia
How they compare
Slovenia currently reports 247.5 days against 246 days in Czechia, a difference of 1.5 days.
Across all 15 years both countries report, Slovenia has been ahead every year.
Czechia ranks 20th and Slovenia ranks 19th of 185 countries.
Slovenia has averaged higher in every one of the 2 decades both report.
Head to head by decade
| Decade | Czechia | Slovenia | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 270 days | 292.8 days | 22.8 days | Slovenia |
| 2010s | 246 days | 256.5 days | 10.5 days | Slovenia |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher dealing with construction permits: time, Czechia or Slovenia?
- Slovenia, at 247.5 days against 246 days in Czechia as of 2019.
- What is the difference in dealing with construction permits: time between Czechia and Slovenia?
- 1.5 days, with Slovenia ahead.
- How many years of comparable data are there for Czechia and Slovenia?
- 15 years are reported by both, from 2005 to 2019.
- How do Czechia and Slovenia rank globally for dealing with construction permits: time?
- Czechia ranks 20th and Slovenia ranks 19th of 185 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.