Czechia vs Trinidad and Tobago: Dealing with construction permits: Time
Dealing with construction permits: Time over time
- Czechia
- Trinidad and Tobago
How they compare
Trinidad and Tobago currently reports 254 days against 246 days in Czechia, a difference of 8 days.
The two have swapped places 1 time across 15 shared years of data; in 2005 it was Czechia ahead.
Czechia ranks 20th and Trinidad and Tobago ranks 17th of 187 countries.
Across the 2 decades both report, Czechia averaged higher in 1 and Trinidad and Tobago in 1.
Head to head by decade
| Decade | Czechia | Trinidad and Tobago | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 270 days | 254 days | 16 days | Czechia |
| 2010s | 246 days | 254 days | 8 days | Trinidad and Tobago |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher dealing with construction permits: time, Czechia or Trinidad and Tobago?
- Trinidad and Tobago, at 254 days against 246 days in Czechia as of 2019.
- What is the difference in dealing with construction permits: time between Czechia and Trinidad and Tobago?
- 8 days, with Trinidad and Tobago ahead.
- How many years of comparable data are there for Czechia and Trinidad and Tobago?
- 15 years are reported by both, from 2005 to 2019.
- How do Czechia and Trinidad and Tobago rank globally for dealing with construction permits: time?
- Czechia ranks 20th and Trinidad and Tobago ranks 17th of 187 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.