Dealing with construction permits: Time in Trinidad and Tobago
Trinidad and Tobago: Dealing with construction permits: Time was 254 days in 2019. ▬ Flat
Dealing with construction permits: Time in Trinidad and Tobago, 2005–2019
Source: World Bank. Measured in days.
Analysis
In 2019, dealing with construction permits: time in Trinidad and Tobago stood at 254 days. That is the highest value across all 15 years on record.
Compared with earlier readings it is unchanged over ten years.
Over the whole period, dealing with construction permits: time in Trinidad and Tobago peaked at 254 days in 2005 and was at its lowest, 254 days, in 2005.
Trinidad and Tobago ranks 17th of 185 countries on this measure, in the top 10%.
Averages by decade
| Decade | Average | Lowest | Highest | Years |
|---|---|---|---|---|
| 2000s | 254 days | 254 days | 254 days | 5 |
| 2010s | 254 days | 254 days | 254 days | 10 |
Countries ranked near Trinidad and Tobago
More private sector data for Trinidad and Tobago
- Merchandise trade 48.6% (2025)
- Food imports 16.4% (2024)
- Manufactures imports 61.9% (2024)
- Merchandise imports 5.80 billion current US$ (2025)
- Food exports 8.2% (2024)
- Manufactures exports 59.1% (2024)
- Merchandise exports 6.82 billion current US$ (2025)
- Commercial service exports 1.26 billion current US$ (2025)
- Transport services 23.3% (2025)
- Computer, communications and other services 34.6% (2025)
Frequently asked questions
- What is dealing with construction permits: time in Trinidad and Tobago?
- Dealing with construction permits: time in Trinidad and Tobago was 254 days in 2019, according to the World Bank.
- What is the highest dealing with construction permits: time recorded in Trinidad and Tobago?
- The highest recorded value was 254 days in 2005.
- What is the lowest dealing with construction permits: time recorded in Trinidad and Tobago?
- The lowest recorded value was 254 days in 2005.
- How does Trinidad and Tobago rank for dealing with construction permits: time?
- Trinidad and Tobago ranks 17th out of 185 countries with data for 2019.
- Is dealing with construction permits: time rising or falling in Trinidad and Tobago?
- Over the last ten years it is unchanged. The long-run trend across the full record is flat.
- Where does this Trinidad and Tobago data come from?
- The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.
Download this data
CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).
About this data
The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.