Dealing with construction permits: Time in Trinidad and Tobago

Trinidad and Tobago: Dealing with construction permits: Time was 254 days in 2019. ▬ Flat

Latest (2019)
254 days
Change on year
unchanged
World rank
17th
of 185 countries
All-time high
254 days
in 2005
All-time low
254 days
in 2005
Years of data
15
2005–2019

Dealing with construction permits: Time in Trinidad and Tobago, 2005–2019

01002003002005201220192005: 254 days2006: 254 days2007: 254 days2008: 254 days2009: 254 days2010: 254 days2011: 254 days2012: 254 days2013: 254 days2014: 254 days2015: 254 days2016: 254 days2017: 254 days2018: 254 days2019: 254 days

Source: World Bank. Measured in days.

Analysis

In 2019, dealing with construction permits: time in Trinidad and Tobago stood at 254 days. That is the highest value across all 15 years on record.

Compared with earlier readings it is unchanged over ten years.

Over the whole period, dealing with construction permits: time in Trinidad and Tobago peaked at 254 days in 2005 and was at its lowest, 254 days, in 2005.

Trinidad and Tobago ranks 17th of 185 countries on this measure, in the top 10%.

Averages by decade

DecadeAverage LowestHighest Years
2000s 254 days 254 days 254 days 5
2010s 254 days 254 days 254 days 10

Countries ranked near Trinidad and Tobago

  1. 14 Uruguay 265 days compare
  2. 15 Romania 260 days compare
  3. 16 Sudan 255 days compare
  4. 18 Canada 249 days compare
  5. 19 Slovenia 247.5 days compare
  6. 20 Czechia 246 days compare
  7. 20 Uzbekistan 246 days compare

See the full ranking of 187 places →

More private sector data for Trinidad and Tobago

All data for Trinidad and Tobago →

Frequently asked questions

What is dealing with construction permits: time in Trinidad and Tobago?
Dealing with construction permits: time in Trinidad and Tobago was 254 days in 2019, according to the World Bank.
What is the highest dealing with construction permits: time recorded in Trinidad and Tobago?
The highest recorded value was 254 days in 2005.
What is the lowest dealing with construction permits: time recorded in Trinidad and Tobago?
The lowest recorded value was 254 days in 2005.
How does Trinidad and Tobago rank for dealing with construction permits: time?
Trinidad and Tobago ranks 17th out of 185 countries with data for 2019.
Is dealing with construction permits: time rising or falling in Trinidad and Tobago?
Over the last ten years it is unchanged. The long-run trend across the full record is flat.
Where does this Trinidad and Tobago data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.