Denmark vs Jordan: Dealing with construction permits: Time (days) (Time days)

Denmark
64 days
in 2019
Jordan
66 days
in 2019
Denmark rank
180th
Jordan rank
178th

Dealing with construction permits: Time (days) (Time days) over time

  • Denmark
  • Jordan
020406080100200520122019

How they compare

Jordan currently reports 66 days against 64 days in Denmark, a difference of 2 days.

Across all 15 years both countries report, Jordan has been ahead every year.

Denmark ranks 180th and Jordan ranks 178th of 188 countries.

Jordan has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Denmark Jordan Difference Ahead
2000s 64 days 89.4 days 25.4 days Jordan
2010s 64 days 66.3 days 2.3 days Jordan

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Denmark or Jordan?
Jordan, at 66 days against 64 days in Denmark as of 2019.
What is the difference in dealing with construction permits: time between Denmark and Jordan?
2 days, with Jordan ahead.
How many years of comparable data are there for Denmark and Jordan?
15 years are reported by both, from 2005 to 2019.
How do Denmark and Jordan rank globally for dealing with construction permits: time?
Denmark ranks 180th and Jordan ranks 178th of 188 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Denmark vs Jordan: Dealing with construction permits: Time. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-time-days/denmark/jordan/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-time-days/denmark/jordan/">Denmark vs Jordan: Dealing with construction permits: Time</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.