Dealing with construction permits: Time in Denmark

Denmark: Dealing with construction permits: Time was 64 days in 2019. ▬ Flat

Latest (2019)
64 days
Change on year
unchanged
World rank
177th
of 185 countries
All-time high
64 days
in 2005
All-time low
64 days
in 2005
Years of data
15
2005–2019

Dealing with construction permits: Time in Denmark, 2005–2019

02040602005201220192005: 64 days2006: 64 days2007: 64 days2008: 64 days2009: 64 days2010: 64 days2011: 64 days2012: 64 days2013: 64 days2014: 64 days2015: 64 days2016: 64 days2017: 64 days2018: 64 days2019: 64 days

Source: World Bank. Measured in days.

Analysis

Denmark recorded 64 days for dealing with construction permits: time in 2019. That is the highest value across all 15 years on record.

Compared with earlier readings it is unchanged over ten years.

Over the whole period, dealing with construction permits: time in Denmark peaked at 64 days in 2005 and was at its lowest, 64 days, in 2005.

That places Denmark 177th out of 185 countries with data for 2019, putting it in the bottom quarter.

Averages by decade

DecadeAverage LowestHighest Years
2000s 64 days 64 days 64 days 5
2010s 64 days 64 days 64 days 10

Countries ranked near Denmark

  1. 174 Sao Tome and Principe 67 days compare
  2. 175 Jordan 66 days compare
  3. 176 Finland 65 days compare
  4. 178 Georgia 63 days compare
  5. 179 Morocco 58 days compare
  6. 180 Samoa 57 days compare

See the full ranking of 187 places →

More private sector data for Denmark

All data for Denmark →

Frequently asked questions

What is dealing with construction permits: time in Denmark?
Dealing with construction permits: time in Denmark was 64 days in 2019, according to the World Bank.
What is the highest dealing with construction permits: time recorded in Denmark?
The highest recorded value was 64 days in 2005.
What is the lowest dealing with construction permits: time recorded in Denmark?
The lowest recorded value was 64 days in 2005.
How does Denmark rank for dealing with construction permits: time?
Denmark ranks 177th out of 185 countries with data for 2019.
Is dealing with construction permits: time rising or falling in Denmark?
Over the last ten years it is unchanged. The long-run trend across the full record is flat.
Where does this Denmark data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.