Denmark vs Morocco: Dealing with construction permits: Time

Denmark
64 days
in 2019
Morocco
58 days
in 2019
Denmark rank
177th
Morocco rank
179th

Dealing with construction permits: Time over time

  • Denmark
  • Morocco
0255075100125200520122019

How they compare

Denmark currently reports 64 days against 58 days in Morocco, a difference of 6 days.

That makes Denmark's figure about 1.1 times Morocco's.

The two have swapped places 1 time across 15 shared years of data; in 2005 it was Morocco ahead.

Denmark ranks 177th and Morocco ranks 179th of 185 countries.

Morocco has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Denmark Morocco Difference Ahead
2000s 64 days 109 days 45 days Morocco
2010s 64 days 64.2 days 0.2 days Morocco

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Denmark or Morocco?
Denmark, at 64 days against 58 days in Morocco as of 2019.
What is the difference in dealing with construction permits: time between Denmark and Morocco?
6 days, with Denmark ahead.
How many years of comparable data are there for Denmark and Morocco?
15 years are reported by both, from 2005 to 2019.
How do Denmark and Morocco rank globally for dealing with construction permits: time?
Denmark ranks 177th and Morocco ranks 179th of 185 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.