Dealing with construction permits: Time (days) (Time days) in Morocco

Morocco: Dealing with construction permits: Time was 58 days in 2019. ▼ Falling

Latest (2019)
58 days
Change on year
up 9.4%
World rank
182nd
of 188 countries
All-time high
115 days
in 2005
All-time low
53 days
in 2018
Years of data
15
2005–2019

Dealing with construction permits: Time in Morocco, 2005–2019

02550751001252005201220192005: 115 days2006: 115 days2007: 105 days2008: 105 days2009: 105 days2010: 105 days2011: 68 days2012: 68 days2013: 68 days2014: 59 days2015: 56 days2016: 53.5 days2017: 53.5 days2018: 53 days2019: 58 days

Source: World Bank. Measured in days.

Analysis

Morocco recorded 58 days for dealing with construction permits: time in 2019.

That represents a change of up 9.4% on the previous year and down 44.8% over ten years.

Over the whole period, dealing with construction permits: time in Morocco peaked at 115 days in 2005 and was at its lowest, 53 days, in 2018.

That places Morocco 182nd out of 188 countries with data for 2019, putting it in the bottom quarter.

The long-run direction has been consistently falling across the 15 years of available data.

Dealing with construction permits: Time in Morocco, year by year

Annual values for Dealing with construction permits: Time (days) in Morocco, 2005 to 2019.
Year days Change
2005 115 days —
2006 115 days +0.0%
2007 105 days -8.7%
2008 105 days +0.0%
2009 105 days +0.0%
2010 105 days +0.0%
2011 68 days -35.2%
2012 68 days +0.0%
2013 68 days +0.0%
2014 59 days -13.2%
2015 56 days -5.1%
2016 53.5 days -4.5%
2017 53.5 days +0.0%
2018 53 days -0.9%
2019 58 days +9.4%

Morocco compared with similar countries

  • Morocco's 58 days is below the median for lower middle income countries, which is 159 days, 36% of the median. (47 countries reporting)
  • Morocco's 58 days is below the median for Middle East, North Africa, Afghanistan & Pakistan, which is 127.5 days, 45% of the median. (22 countries reporting)

Biggest year-on-year movements

Years where Dealing with construction permits: Time in Morocco changed far more than this series normally does. A large move can be a real event or a change in how the figure was measured — the source note below says who published it.

YearChange FromTo
2011 -35.2% 105 days 68 days

Averages by decade

DecadeAverage LowestHighest Years
2000s 109 days 105 days 115 days 5
2010s 64.2 days 53 days 105 days 10

Countries ranked near Morocco

  1. 179 Finland 65 days compare
  2. 180 Denmark 64 days compare
  3. 181 Georgia 63 days compare
  4. 183 Samoa 57 days compare
  5. 184 United Arab Emirates 47.5 days compare
  6. 185 Malaysia 41 days compare

See the full ranking of 188 places →

More private sector data for Morocco

All data for Morocco →

Frequently asked questions

What is dealing with construction permits: time in Morocco?
Dealing with construction permits: time in Morocco was 58 days in 2019, according to the World Bank.
What is the highest dealing with construction permits: time recorded in Morocco?
The highest recorded value was 115 days in 2005.
What is the lowest dealing with construction permits: time recorded in Morocco?
The lowest recorded value was 53 days in 2018.
How does Morocco rank for dealing with construction permits: time?
Morocco ranks 182nd out of 188 countries with data for 2019.
Is dealing with construction permits: time rising or falling in Morocco?
Over the last ten years it is down 44.8%. The long-run trend across the full record is falling.
Where does this Morocco data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Dealing with construction permits: Time in Morocco. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/stat/dealing-with-construction-permits-time-days/morocco/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/dealing-with-construction-permits-time-days/morocco/">Dealing with construction permits: Time in Morocco</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.