Denmark vs Samoa: Dealing with construction permits: Time

Denmark
64 days
in 2019
Samoa
57 days
in 2019
Denmark rank
177th
Samoa rank
180th

Dealing with construction permits: Time over time

  • Denmark
  • Samoa
0204060200520122019

How they compare

Denmark currently reports 64 days against 57 days in Samoa, a difference of 7 days.

That makes Denmark's figure about 1.1 times Samoa's.

Across all 15 years both countries report, Denmark has been ahead every year.

Denmark ranks 177th and Samoa ranks 180th of 185 countries.

Denmark has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Denmark Samoa Difference Ahead
2000s 64 days 57 days 7 days Denmark
2010s 64 days 57 days 7 days Denmark

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Denmark or Samoa?
Denmark, at 64 days against 57 days in Samoa as of 2019.
What is the difference in dealing with construction permits: time between Denmark and Samoa?
7 days, with Denmark ahead.
How many years of comparable data are there for Denmark and Samoa?
15 years are reported by both, from 2005 to 2019.
How do Denmark and Samoa rank globally for dealing with construction permits: time?
Denmark ranks 177th and Samoa ranks 180th of 185 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.