Denmark vs São Tomé and Príncipe, Democratic Republic of: Dealing with construction permits: Time
Dealing with construction permits: Time over time
- Denmark
- São Tomé and Príncipe, Democratic Republic of
How they compare
São Tomé and Príncipe, Democratic Republic of currently reports 67 days against 64 days in Denmark, a difference of 3 days.
Across all 15 years both countries report, São Tomé and Príncipe, Democratic Republic of has been ahead every year.
Denmark ranks 179th and São Tomé and Príncipe, Democratic Republic of ranks 176th of 187 countries.
São Tomé and Príncipe, Democratic Republic of has averaged higher in every one of the 2 decades both report.
Head to head by decade
| Decade | Denmark | São Tomé and Príncipe, Democratic Republic of | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 64 days | 221 days | 157 days | São Tomé and Príncipe, Democratic Republic of |
| 2010s | 64 days | 86.6 days | 22.6 days | São Tomé and Príncipe, Democratic Republic of |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher dealing with construction permits: time, Denmark or São Tomé and Príncipe, Democratic Republic of?
- São Tomé and Príncipe, Democratic Republic of, at 67 days against 64 days in Denmark as of 2019.
- What is the difference in dealing with construction permits: time between Denmark and São Tomé and Príncipe, Democratic Republic of?
- 3 days, with São Tomé and Príncipe, Democratic Republic of ahead.
- How many years of comparable data are there for Denmark and São Tomé and Príncipe, Democratic Republic of?
- 15 years are reported by both, from 2005 to 2019.
- How do Denmark and São Tomé and Príncipe, Democratic Republic of rank globally for dealing with construction permits: time?
- Denmark ranks 179th and São Tomé and Príncipe, Democratic Republic of ranks 176th of 187 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.