Dominica vs Kiribati: Dealing with construction permits: Time

Dominica
191 days
in 2019
Kiribati
185 days
in 2019
Dominica rank
42nd
Kiribati rank
45th

Dealing with construction permits: Time over time

  • Dominica
  • Kiribati
050100150200200520122019

How they compare

Dominica currently reports 191 days against 185 days in Kiribati, a difference of 6 days.

Across all 15 years both countries report, Dominica has been ahead every year.

Dominica ranks 42nd and Kiribati ranks 45th of 185 countries.

Dominica has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Dominica Kiribati Difference Ahead
2000s 191 days 184.6 days 6.4 days Dominica
2010s 191 days 185 days 6 days Dominica

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Dominica or Kiribati?
Dominica, at 191 days against 185 days in Kiribati as of 2019.
What is the difference in dealing with construction permits: time between Dominica and Kiribati?
6 days, with Dominica ahead.
How many years of comparable data are there for Dominica and Kiribati?
15 years are reported by both, from 2005 to 2019.
How do Dominica and Kiribati rank globally for dealing with construction permits: time?
Dominica ranks 42nd and Kiribati ranks 45th of 185 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.