Dealing with construction permits: Time in Dominica

Dominica: Dealing with construction permits: Time was 191 days in 2019. ▬ Flat

Latest (2019)
191 days
Change on year
unchanged
World rank
42nd
of 185 countries
All-time high
191 days
in 2005
All-time low
191 days
in 2005
Years of data
15
2005–2019

Dealing with construction permits: Time in Dominica, 2005–2019

0501001502002005201220192005: 191 days2006: 191 days2007: 191 days2008: 191 days2009: 191 days2010: 191 days2011: 191 days2012: 191 days2013: 191 days2014: 191 days2015: 191 days2016: 191 days2017: 191 days2018: 191 days2019: 191 days

Source: World Bank. Measured in days.

Analysis

In 2019, dealing with construction permits: time in Dominica stood at 191 days. That is the highest value across all 15 years on record.

That represents a change of unchanged over ten years.

Over the whole period, dealing with construction permits: time in Dominica peaked at 191 days in 2005 and was at its lowest, 191 days, in 2005.

Dominica ranks 42nd of 185 countries on this measure, in the top quarter.

Averages by decade

DecadeAverage LowestHighest Years
2000s 191 days 191 days 191 days 5
2010s 191 days 191 days 191 days 10

Countries ranked near Dominica

  1. 39 Madagascar 194 days compare
  2. 40 Hungary 192.5 days compare
  3. 41 Latvia 192 days compare
  4. 43 Italy 189.5 days compare
  5. 44 Zambia 188 days compare
  6. 45 Kiribati 185 days compare

See the full ranking of 187 places →

More private sector data for Dominica

All data for Dominica →

Frequently asked questions

What is dealing with construction permits: time in Dominica?
Dealing with construction permits: time in Dominica was 191 days in 2019, according to the World Bank.
What is the highest dealing with construction permits: time recorded in Dominica?
The highest recorded value was 191 days in 2005.
What is the lowest dealing with construction permits: time recorded in Dominica?
The lowest recorded value was 191 days in 2005.
How does Dominica rank for dealing with construction permits: time?
Dominica ranks 42nd out of 185 countries with data for 2019.
Is dealing with construction permits: time rising or falling in Dominica?
Over the last ten years it is unchanged. The long-run trend across the full record is flat.
Where does this Dominica data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.