Dealing with construction permits: Time in Dominica
Dominica: Dealing with construction permits: Time was 191 days in 2019. ▬ Flat
Dealing with construction permits: Time in Dominica, 2005–2019
Source: World Bank. Measured in days.
Analysis
In 2019, dealing with construction permits: time in Dominica stood at 191 days. That is the highest value across all 15 years on record.
That represents a change of unchanged over ten years.
Over the whole period, dealing with construction permits: time in Dominica peaked at 191 days in 2005 and was at its lowest, 191 days, in 2005.
Dominica ranks 42nd of 185 countries on this measure, in the top quarter.
Averages by decade
| Decade | Average | Lowest | Highest | Years |
|---|---|---|---|---|
| 2000s | 191 days | 191 days | 191 days | 5 |
| 2010s | 191 days | 191 days | 191 days | 10 |
Countries ranked near Dominica
More private sector data for Dominica
- Merchandise trade 39.1% (2025)
- Food imports 25.2% (2023)
- Manufactures imports 53.5% (2023)
- Merchandise imports 259.00 million current US$ (2025)
- Food exports 41.2% (2023)
- Manufactures exports 57.8% (2023)
- Merchandise exports 24.00 million current US$ (2025)
- Commercial service exports 177.62 million current US$ (2025)
- Transport services 19.2% (2025)
- Computer, communications and other services 57.4% (2025)
Frequently asked questions
- What is dealing with construction permits: time in Dominica?
- Dealing with construction permits: time in Dominica was 191 days in 2019, according to the World Bank.
- What is the highest dealing with construction permits: time recorded in Dominica?
- The highest recorded value was 191 days in 2005.
- What is the lowest dealing with construction permits: time recorded in Dominica?
- The lowest recorded value was 191 days in 2005.
- How does Dominica rank for dealing with construction permits: time?
- Dominica ranks 42nd out of 185 countries with data for 2019.
- Is dealing with construction permits: time rising or falling in Dominica?
- Over the last ten years it is unchanged. The long-run trend across the full record is flat.
- Where does this Dominica data come from?
- The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.
Download this data
CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).
About this data
The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.