Dealing with construction permits: Time in Kiribati
Kiribati: Dealing with construction permits: Time was 185 days in 2019. ▬ Flat
Dealing with construction permits: Time in Kiribati, 2005–2019
Source: World Bank. Measured in days.
Analysis
In 2019, dealing with construction permits: time in Kiribati stood at 185 days. That is the highest value across all 15 years on record.
That represents a change of unchanged over ten years.
Over the whole period, dealing with construction permits: time in Kiribati peaked at 185 days in 2007 and was at its lowest, 184 days, in 2005.
Kiribati ranks 45th of 185 countries on this measure, in the top quarter.
Averages by decade
| Decade | Average | Lowest | Highest | Years |
|---|---|---|---|---|
| 2000s | 184.6 days | 184 days | 185 days | 5 |
| 2010s | 185 days | 185 days | 185 days | 10 |
Countries ranked near Kiribati
More private sector data for Kiribati
- Merchandise trade 147.8% (2025)
- Food imports 41.4% (2021)
- Manufactures imports 43.0% (2021)
- Merchandise imports 496.00 million current US$ (2025)
- Food exports 97.2% (2021)
- Manufactures exports 2.1% (2021)
- Merchandise exports 20.00 million current US$ (2025)
- Commercial service exports 6.05 million current US$ (2025)
- Transport services 70.8% (2025)
- Computer, communications and other services 4.9% (2025)
Frequently asked questions
- What is dealing with construction permits: time in Kiribati?
- Dealing with construction permits: time in Kiribati was 185 days in 2019, according to the World Bank.
- What is the highest dealing with construction permits: time recorded in Kiribati?
- The highest recorded value was 185 days in 2007.
- What is the lowest dealing with construction permits: time recorded in Kiribati?
- The lowest recorded value was 184 days in 2005.
- How does Kiribati rank for dealing with construction permits: time?
- Kiribati ranks 45th out of 185 countries with data for 2019.
- Is dealing with construction permits: time rising or falling in Kiribati?
- Over the last ten years it is unchanged. The long-run trend across the full record is flat.
- Where does this Kiribati data come from?
- The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.
Download this data
CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).
About this data
The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.