Dealing with construction permits: Time in Kiribati

Kiribati: Dealing with construction permits: Time was 185 days in 2019. ▬ Flat

Latest (2019)
185 days
Change on year
unchanged
World rank
45th
of 185 countries
All-time high
185 days
in 2007
All-time low
184 days
in 2005
Years of data
15
2005–2019

Dealing with construction permits: Time in Kiribati, 2005–2019

0501001502002005201220192005: 184 days2006: 184 days2007: 185 days2008: 185 days2009: 185 days2010: 185 days2011: 185 days2012: 185 days2013: 185 days2014: 185 days2015: 185 days2016: 185 days2017: 185 days2018: 185 days2019: 185 days

Source: World Bank. Measured in days.

Analysis

In 2019, dealing with construction permits: time in Kiribati stood at 185 days. That is the highest value across all 15 years on record.

That represents a change of unchanged over ten years.

Over the whole period, dealing with construction permits: time in Kiribati peaked at 185 days in 2007 and was at its lowest, 184 days, in 2005.

Kiribati ranks 45th of 185 countries on this measure, in the top quarter.

Averages by decade

DecadeAverage LowestHighest Years
2000s 184.6 days 184 days 185 days 5
2010s 185 days 185 days 185 days 10

Countries ranked near Kiribati

  1. 42 Dominica 191 days compare
  2. 43 Italy 189.5 days compare
  3. 44 Zambia 188 days compare
  4. 46 Angola 184 days compare
  5. 46 Tanzania 184 days compare
  6. 46 Yemen 184 days compare

See the full ranking of 187 places →

More private sector data for Kiribati

All data for Kiribati →

Frequently asked questions

What is dealing with construction permits: time in Kiribati?
Dealing with construction permits: time in Kiribati was 185 days in 2019, according to the World Bank.
What is the highest dealing with construction permits: time recorded in Kiribati?
The highest recorded value was 185 days in 2007.
What is the lowest dealing with construction permits: time recorded in Kiribati?
The lowest recorded value was 184 days in 2005.
How does Kiribati rank for dealing with construction permits: time?
Kiribati ranks 45th out of 185 countries with data for 2019.
Is dealing with construction permits: time rising or falling in Kiribati?
Over the last ten years it is unchanged. The long-run trend across the full record is flat.
Where does this Kiribati data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.