Dominican Republic vs East Timor: Dealing with construction permits: Time
Dealing with construction permits: Time over time
- Dominican Republic
- East Timor
How they compare
East Timor currently reports 207 days against 206 days in Dominican Republic, a difference of 1 days.
The two have swapped places 1 time across 15 shared years of data; in 2005 it was Dominican Republic ahead.
Dominican Republic ranks 34th and East Timor ranks 33rd of 185 countries.
Across the 2 decades both report, Dominican Republic averaged higher in 1 and East Timor in 1.
Head to head by decade
| Decade | Dominican Republic | East Timor | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 223 days | 207 days | 16 days | Dominican Republic |
| 2010s | 203.5 days | 207 days | 3.5 days | East Timor |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher dealing with construction permits: time, Dominican Republic or East Timor?
- East Timor, at 207 days against 206 days in Dominican Republic as of 2019.
- What is the difference in dealing with construction permits: time between Dominican Republic and East Timor?
- 1 days, with East Timor ahead.
- How many years of comparable data are there for Dominican Republic and East Timor?
- 15 years are reported by both, from 2005 to 2019.
- How do Dominican Republic and East Timor rank globally for dealing with construction permits: time?
- Dominican Republic ranks 34th and East Timor ranks 33rd of 185 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.