Ecuador vs Ethiopia: Dealing with construction permits: Time (days) (Time days)

Ecuador
132 days
in 2019
Ethiopia
136 days
in 2019
Ecuador rank
101st
Ethiopia rank
99th

Dealing with construction permits: Time (days) (Time days) over time

  • Ecuador
  • Ethiopia
050100150200520122019

How they compare

Ethiopia currently reports 136 days against 132 days in Ecuador, a difference of 4 days.

Across all 15 years both countries report, Ethiopia has been ahead every year.

Ecuador ranks 101st and Ethiopia ranks 99th of 188 countries.

Ethiopia has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Ecuador Ethiopia Difference Ahead
2000s 132 days 142 days 10 days Ethiopia
2010s 132 days 145.3 days 13.3 days Ethiopia

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Ecuador or Ethiopia?
Ethiopia, at 136 days against 132 days in Ecuador as of 2019.
What is the difference in dealing with construction permits: time between Ecuador and Ethiopia?
4 days, with Ethiopia ahead.
How many years of comparable data are there for Ecuador and Ethiopia?
15 years are reported by both, from 2005 to 2019.
How do Ecuador and Ethiopia rank globally for dealing with construction permits: time?
Ecuador ranks 101st and Ethiopia ranks 99th of 188 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Ecuador vs Ethiopia: Dealing with construction permits: Time. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-time-days/ecuador/ethiopia/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-time-days/ecuador/ethiopia/">Ecuador vs Ethiopia: Dealing with construction permits: Time</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.