Ecuador vs Tunisia: Dealing with construction permits: Time

Ecuador
132 days
in 2019
Tunisia
133 days
in 2019
Ecuador rank
98th
Tunisia rank
97th

Dealing with construction permits: Time over time

  • Ecuador
  • Tunisia
050100150200520122019

How they compare

Tunisia currently reports 133 days against 132 days in Ecuador, a difference of 1 days.

The two have swapped places 1 time across 15 shared years of data; in 2005 it was Ecuador ahead.

Ecuador ranks 98th and Tunisia ranks 97th of 185 countries.

Ecuador has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Ecuador Tunisia Difference Ahead
2000s 132 days 87 days 45 days Ecuador
2010s 132 days 129.2 days 2.8 days Ecuador

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Ecuador or Tunisia?
Tunisia, at 133 days against 132 days in Ecuador as of 2019.
What is the difference in dealing with construction permits: time between Ecuador and Tunisia?
1 days, with Tunisia ahead.
How many years of comparable data are there for Ecuador and Tunisia?
15 years are reported by both, from 2005 to 2019.
How do Ecuador and Tunisia rank globally for dealing with construction permits: time?
Ecuador ranks 98th and Tunisia ranks 97th of 185 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.