Ecuador vs Tunisia: Dealing with construction permits: Time
Dealing with construction permits: Time over time
- Ecuador
- Tunisia
How they compare
Tunisia currently reports 133 days against 132 days in Ecuador, a difference of 1 days.
The two have swapped places 1 time across 15 shared years of data; in 2005 it was Ecuador ahead.
Ecuador ranks 98th and Tunisia ranks 97th of 185 countries.
Ecuador has averaged higher in every one of the 2 decades both report.
Head to head by decade
| Decade | Ecuador | Tunisia | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 132 days | 87 days | 45 days | Ecuador |
| 2010s | 132 days | 129.2 days | 2.8 days | Ecuador |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher dealing with construction permits: time, Ecuador or Tunisia?
- Tunisia, at 133 days against 132 days in Ecuador as of 2019.
- What is the difference in dealing with construction permits: time between Ecuador and Tunisia?
- 1 days, with Tunisia ahead.
- How many years of comparable data are there for Ecuador and Tunisia?
- 15 years are reported by both, from 2005 to 2019.
- How do Ecuador and Tunisia rank globally for dealing with construction permits: time?
- Ecuador ranks 98th and Tunisia ranks 97th of 185 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.