Dealing with construction permits: Time in Tunisia

Tunisia: Dealing with construction permits: Time was 133 days in 2019. ▲ Rising

Latest (2019)
133 days
Change on year
unchanged
World rank
97th
of 185 countries
All-time high
134 days
in 2011
All-time low
87 days
in 2005
Years of data
15
2005–2019

Dealing with construction permits: Time in Tunisia, 2005–2019

0501001502005201220192005: 87 days2006: 87 days2007: 87 days2008: 87 days2009: 87 days2010: 94 days2011: 134 days2012: 133 days2013: 133 days2014: 133 days2015: 133 days2016: 133 days2017: 133 days2018: 133 days2019: 133 days

Source: World Bank. Measured in days.

Analysis

The most recent figure for dealing with construction permits: time in Tunisia is 133 days, measured in 2019.

That represents a change of up 52.9% over ten years.

Over the whole period, dealing with construction permits: time in Tunisia peaked at 134 days in 2011 and was at its lowest, 87 days, in 2005.

That places Tunisia 97th out of 185 countries with data for 2019, putting it in the middle of the range.

The long-run direction has been consistently rising across the 15 years of available data.

Averages by decade

DecadeAverage LowestHighest Years
2000s 87 days 87 days 87 days 5
2010s 129.2 days 94 days 134 days 10

Countries ranked near Tunisia

  1. 96 Ethiopia 136 days compare
  2. 98 Colombia 132 days compare
  3. 98 Ecuador 132 days compare
  4. 98 Honduras 132 days compare

See the full ranking of 187 places →

More private sector data for Tunisia

All data for Tunisia →

Frequently asked questions

What is dealing with construction permits: time in Tunisia?
Dealing with construction permits: time in Tunisia was 133 days in 2019, according to the World Bank.
What is the highest dealing with construction permits: time recorded in Tunisia?
The highest recorded value was 134 days in 2011.
What is the lowest dealing with construction permits: time recorded in Tunisia?
The lowest recorded value was 87 days in 2005.
How does Tunisia rank for dealing with construction permits: time?
Tunisia ranks 97th out of 185 countries with data for 2019.
Is dealing with construction permits: time rising or falling in Tunisia?
Over the last ten years it is up 52.9%. The long-run trend across the full record is rising.
Where does this Tunisia data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.