Egypt vs Ghana: Dealing with construction permits: Time (days) (Time days)

Egypt
173 days
in 2019
Ghana
170 days
in 2019
Egypt rank
59th
Ghana rank
61st

Dealing with construction permits: Time (days) (Time days) over time

  • Egypt
  • Ghana
050100150200250200520122019

How they compare

Egypt currently reports 173 days against 170 days in Ghana, a difference of 3 days.

The two have swapped places 2 times across 15 shared years of data; in 2005 it was Egypt ahead.

Egypt ranks 59th and Ghana ranks 61st of 188 countries.

Ghana has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Egypt Ghana Difference Ahead
2000s 215 days 215 days 0 days —
2010s 172.3 days 188 days 15.7 days Ghana

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Egypt or Ghana?
Egypt, at 173 days against 170 days in Ghana as of 2019.
What is the difference in dealing with construction permits: time between Egypt and Ghana?
3 days, with Egypt ahead.
How many years of comparable data are there for Egypt and Ghana?
15 years are reported by both, from 2005 to 2019.
How do Egypt and Ghana rank globally for dealing with construction permits: time?
Egypt ranks 59th and Ghana ranks 61st of 188 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Egypt vs Ghana: Dealing with construction permits: Time. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-time-days/egypt-arab-rep/ghana/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-time-days/egypt-arab-rep/ghana/">Egypt vs Ghana: Dealing with construction permits: Time</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.