Dealing with construction permits: Time (days) (Time days) in Egypt

Egypt: Dealing with construction permits: Time was 173 days in 2019. ▼ Falling

Latest (2019)
173 days
Change on year
unchanged
World rank
59th
of 188 countries
All-time high
234 days
in 2008
All-time low
172 days
in 2011
Years of data
15
2005–2019

Dealing with construction permits: Time in Egypt, 2005–2019

0501001502002502005201220192005: 224 days2006: 222 days2007: 222 days2008: 234 days2009: 173 days2010: 173 days2011: 172 days2012: 172 days2013: 172 days2014: 172 days2015: 172 days2016: 172 days2017: 172 days2018: 173 days2019: 173 days

Source: World Bank. Measured in days.

Analysis

Egypt recorded 173 days for dealing with construction permits: time in 2019.

The figure is unchanged over ten years.

Over the whole period, dealing with construction permits: time in Egypt peaked at 234 days in 2008 and was at its lowest, 172 days, in 2011.

That places Egypt 59th out of 188 countries with data for 2019, putting it in the middle of the range.

The long-run direction has been consistently falling across the 15 years of available data.

Dealing with construction permits: Time in Egypt, year by year

Annual values for Dealing with construction permits: Time (days) in Egypt, 2005 to 2019.
Year days Change
2005 224 days —
2006 222 days -0.9%
2007 222 days +0.0%
2008 234 days +5.4%
2009 173 days -26.1%
2010 173 days +0.0%
2011 172 days -0.6%
2012 172 days +0.0%
2013 172 days +0.0%
2014 172 days +0.0%
2015 172 days +0.0%
2016 172 days +0.0%
2017 172 days +0.0%
2018 173 days +0.6%
2019 173 days +0.0%

Egypt compared with similar countries

  • Egypt's 173 days is above the median for lower middle income countries, which is 159 days, 1.1× the median. (47 countries reporting)
  • Egypt's 173 days is above the median for Middle East, North Africa, Afghanistan & Pakistan, which is 127.5 days, 1.4× the median. (22 countries reporting)

Averages by decade

DecadeAverage LowestHighest Years
2000s 215 days 173 days 234 days 5
2010s 172.3 days 172 days 173 days 10

Countries ranked near Egypt

  1. 56 Malta 179 days compare
  2. 57 Zimbabwe 178 days compare
  3. 58 Senegal 177 days compare
  4. 59 Gambia 173 days compare
  5. 61 Ghana 170 days compare
  6. 62 Togo 168.5 days compare

See the full ranking of 188 places →

More private sector data for Egypt

All data for Egypt →

Frequently asked questions

What is dealing with construction permits: time in Egypt?
Dealing with construction permits: time in Egypt was 173 days in 2019, according to the World Bank.
What is the highest dealing with construction permits: time recorded in Egypt?
The highest recorded value was 234 days in 2008.
What is the lowest dealing with construction permits: time recorded in Egypt?
The lowest recorded value was 172 days in 2011.
How does Egypt rank for dealing with construction permits: time?
Egypt ranks 59th out of 188 countries with data for 2019.
Is dealing with construction permits: time rising or falling in Egypt?
Over the last ten years it is unchanged. The long-run trend across the full record is falling.
Where does this Egypt data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Dealing with construction permits: Time in Egypt. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/stat/dealing-with-construction-permits-time-days/egypt-arab-rep/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/dealing-with-construction-permits-time-days/egypt-arab-rep/">Dealing with construction permits: Time in Egypt</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.