Egypt, Arab Rep. vs Senegal: Dealing with construction permits: Time
Dealing with construction permits: Time over time
- Egypt, Arab Rep.
- Senegal
How they compare
Senegal currently reports 177 days against 173 days in Egypt, Arab Rep., a difference of 4 days.
Across all 15 years both countries report, Senegal has been ahead every year.
Egypt, Arab Rep. ranks 57th and Senegal ranks 56th of 185 countries.
Senegal has averaged higher in every one of the 2 decades both report.
Head to head by decade
| Decade | Egypt, Arab Rep. | Senegal | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 215 days | 252 days | 37 days | Senegal |
| 2010s | 172.3 days | 217.5 days | 45.2 days | Senegal |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher dealing with construction permits: time, Egypt, Arab Rep. or Senegal?
- Senegal, at 177 days against 173 days in Egypt, Arab Rep. as of 2019.
- What is the difference in dealing with construction permits: time between Egypt, Arab Rep. and Senegal?
- 4 days, with Senegal ahead.
- How many years of comparable data are there for Egypt, Arab Rep. and Senegal?
- 15 years are reported by both, from 2005 to 2019.
- How do Egypt, Arab Rep. and Senegal rank globally for dealing with construction permits: time?
- Egypt, Arab Rep. ranks 57th and Senegal ranks 56th of 185 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.