Dealing with construction permits: Time (days) (Time days) in Senegal

Senegal: Dealing with construction permits: Time was 177 days in 2019. ▼ Falling

Latest (2019)
177 days
Change on year
unchanged
World rank
58th
of 188 countries
All-time high
267 days
in 2010
All-time low
177 days
in 2015
Years of data
15
2005–2019

Dealing with construction permits: Time in Senegal, 2005–2019

01002003002005201220192005: 252 days2006: 252 days2007: 252 days2008: 252 days2009: 252 days2010: 267 days2011: 267 days2012: 267 days2013: 267 days2014: 222 days2015: 177 days2016: 177 days2017: 177 days2018: 177 days2019: 177 days

Source: World Bank. Measured in days.

Analysis

In 2019, dealing with construction permits: time in Senegal stood at 177 days. That is the lowest value across all 15 years on record.

The figure is down 29.8% over ten years.

Over the whole period, dealing with construction permits: time in Senegal peaked at 267 days in 2010 and was at its lowest, 177 days, in 2015.

Senegal ranks 58th of 188 countries on this measure, in the middle of the range.

The long-run direction has been consistently falling across the 15 years of available data.

Dealing with construction permits: Time in Senegal, year by year

Annual values for Dealing with construction permits: Time (days) in Senegal, 2005 to 2019.
Year days Change
2005 252 days —
2006 252 days +0.0%
2007 252 days +0.0%
2008 252 days +0.0%
2009 252 days +0.0%
2010 267 days +6.0%
2011 267 days +0.0%
2012 267 days +0.0%
2013 267 days +0.0%
2014 222 days -16.9%
2015 177 days -20.3%
2016 177 days +0.0%
2017 177 days +0.0%
2018 177 days +0.0%
2019 177 days +0.0%

Senegal compared with similar countries

  • Senegal's 177 days is above the median for lower middle income countries, which is 159 days, 1.1× the median. (47 countries reporting)
  • Senegal's 177 days is above the median for Sub-Saharan Africa, which is 143.5 days, 1.2× the median. (46 countries reporting)

Averages by decade

DecadeAverage LowestHighest Years
2000s 252 days 252 days 252 days 5
2010s 217.5 days 177 days 267 days 10

Countries ranked near Senegal

  1. 56 Malta 179 days compare
  2. 57 Zimbabwe 178 days compare
  3. 59 Egypt 173 days compare
  4. 59 Gambia 173 days compare
  5. 61 Ghana 170 days compare

See the full ranking of 188 places →

More private sector data for Senegal

All data for Senegal →

Frequently asked questions

What is dealing with construction permits: time in Senegal?
Dealing with construction permits: time in Senegal was 177 days in 2019, according to the World Bank.
What is the highest dealing with construction permits: time recorded in Senegal?
The highest recorded value was 267 days in 2010.
What is the lowest dealing with construction permits: time recorded in Senegal?
The lowest recorded value was 177 days in 2015.
How does Senegal rank for dealing with construction permits: time?
Senegal ranks 58th out of 188 countries with data for 2019.
Is dealing with construction permits: time rising or falling in Senegal?
Over the last ten years it is down 29.8%. The long-run trend across the full record is falling.
Where does this Senegal data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Dealing with construction permits: Time in Senegal. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/stat/dealing-with-construction-permits-time-days/senegal/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/dealing-with-construction-permits-time-days/senegal/">Dealing with construction permits: Time in Senegal</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.