El Salvador vs Slovak Republic: Dealing with construction permits: Time

El Salvador
310 days
in 2019
Slovak Republic
300 days
in 2019
El Salvador rank
8th
Slovak Republic rank
9th

Dealing with construction permits: Time over time

  • El Salvador
  • Slovak Republic
0100200300200520122019

How they compare

El Salvador currently reports 310 days against 300 days in Slovak Republic, a difference of 10 days.

The two have swapped places 1 time across 15 shared years of data; in 2005 it was Slovak Republic ahead.

El Salvador ranks 8th and Slovak Republic ranks 9th of 187 countries.

Slovak Republic has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade El Salvador Slovak Republic Difference Ahead
2000s 176.2 days 300 days 123.8 days Slovak Republic
2010s 184.7 days 300 days 115.3 days Slovak Republic

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, El Salvador or Slovak Republic?
El Salvador, at 310 days against 300 days in Slovak Republic as of 2019.
What is the difference in dealing with construction permits: time between El Salvador and Slovak Republic?
10 days, with El Salvador ahead.
How many years of comparable data are there for El Salvador and Slovak Republic?
15 years are reported by both, from 2005 to 2019.
How do El Salvador and Slovak Republic rank globally for dealing with construction permits: time?
El Salvador ranks 8th and Slovak Republic ranks 9th of 187 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

El Salvador vs Slovak Republic: Dealing with construction permits: Time. Statizoid. Retrieved 20 August 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-time-days/el-salvador/slovak-republic/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-time-days/el-salvador/slovak-republic/">El Salvador vs Slovak Republic: Dealing with construction permits: Time</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.