El Salvador vs Slovak Republic: Dealing with construction permits: Time
Dealing with construction permits: Time over time
- El Salvador
- Slovak Republic
How they compare
El Salvador currently reports 310 days against 300 days in Slovak Republic, a difference of 10 days.
The two have swapped places 1 time across 15 shared years of data; in 2005 it was Slovak Republic ahead.
El Salvador ranks 8th and Slovak Republic ranks 9th of 187 countries.
Slovak Republic has averaged higher in every one of the 2 decades both report.
Head to head by decade
| Decade | El Salvador | Slovak Republic | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 176.2 days | 300 days | 123.8 days | Slovak Republic |
| 2010s | 184.7 days | 300 days | 115.3 days | Slovak Republic |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher dealing with construction permits: time, El Salvador or Slovak Republic?
- El Salvador, at 310 days against 300 days in Slovak Republic as of 2019.
- What is the difference in dealing with construction permits: time between El Salvador and Slovak Republic?
- 10 days, with El Salvador ahead.
- How many years of comparable data are there for El Salvador and Slovak Republic?
- 15 years are reported by both, from 2005 to 2019.
- How do El Salvador and Slovak Republic rank globally for dealing with construction permits: time?
- El Salvador ranks 8th and Slovak Republic ranks 9th of 187 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.