Equatorial Guinea vs Grenada: Dealing with construction permits: Time

Equatorial Guinea
144 days
in 2019
Grenada
146 days
in 2019
Equatorial Guinea rank
85th
Grenada rank
82nd

Dealing with construction permits: Time over time

  • Equatorial Guinea
  • Grenada
050100150200520122019

How they compare

Grenada currently reports 146 days against 144 days in Equatorial Guinea, a difference of 2 days.

Across all 15 years both countries report, Grenada has been ahead every year.

Equatorial Guinea ranks 85th and Grenada ranks 82nd of 185 countries.

Grenada has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Equatorial Guinea Grenada Difference Ahead
2000s 144 days 146 days 2 days Grenada
2010s 144 days 146 days 2 days Grenada

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Equatorial Guinea or Grenada?
Grenada, at 146 days against 144 days in Equatorial Guinea as of 2019.
What is the difference in dealing with construction permits: time between Equatorial Guinea and Grenada?
2 days, with Grenada ahead.
How many years of comparable data are there for Equatorial Guinea and Grenada?
15 years are reported by both, from 2005 to 2019.
How do Equatorial Guinea and Grenada rank globally for dealing with construction permits: time?
Equatorial Guinea ranks 85th and Grenada ranks 82nd of 185 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.