Equatorial Guinea vs San Marino: Dealing with construction permits: Time

Equatorial Guinea
144 days
in 2019
San Marino
145.5 days
in 2019
Equatorial Guinea rank
85th
San Marino rank
84th

Dealing with construction permits: Time over time

  • Equatorial Guinea
  • San Marino
050100150200200520122019

How they compare

San Marino currently reports 145.5 days against 144 days in Equatorial Guinea, a difference of 1.5 days.

Across all 8 years both countries report, San Marino has been ahead every year.

Equatorial Guinea ranks 85th and San Marino ranks 84th of 185 countries.

San Marino has averaged higher in every one of the 1 decades both report.

Frequently asked questions

Which has higher dealing with construction permits: time, Equatorial Guinea or San Marino?
San Marino, at 145.5 days against 144 days in Equatorial Guinea as of 2019.
What is the difference in dealing with construction permits: time between Equatorial Guinea and San Marino?
1.5 days, with San Marino ahead.
How many years of comparable data are there for Equatorial Guinea and San Marino?
8 years are reported by both, from 2012 to 2019.
How do Equatorial Guinea and San Marino rank globally for dealing with construction permits: time?
Equatorial Guinea ranks 85th and San Marino ranks 84th of 185 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.