Eswatini vs Uganda: Dealing with construction permits: Time
Dealing with construction permits: Time over time
- Eswatini
- Uganda
How they compare
Eswatini currently reports 116 days against 113 days in Uganda, a difference of 3 days.
The two have swapped places 1 time across 15 shared years of data; in 2005 it was Uganda ahead.
Eswatini ranks 118th and Uganda ranks 121st of 185 countries.
Uganda has averaged higher in every one of the 2 decades both report.
Head to head by decade
| Decade | Eswatini | Uganda | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 116 days | 145 days | 29 days | Uganda |
| 2010s | 116 days | 130.7 days | 14.7 days | Uganda |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher dealing with construction permits: time, Eswatini or Uganda?
- Eswatini, at 116 days against 113 days in Uganda as of 2019.
- What is the difference in dealing with construction permits: time between Eswatini and Uganda?
- 3 days, with Eswatini ahead.
- How many years of comparable data are there for Eswatini and Uganda?
- 15 years are reported by both, from 2005 to 2019.
- How do Eswatini and Uganda rank globally for dealing with construction permits: time?
- Eswatini ranks 118th and Uganda ranks 121st of 185 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.