Dealing with construction permits: Time in Eswatini
Eswatini: Dealing with construction permits: Time was 116 days in 2019. ▬ Flat
Dealing with construction permits: Time in Eswatini, 2005–2019
Source: World Bank. Measured in days.
Analysis
In 2019, dealing with construction permits: time in Eswatini stood at 116 days. That is the highest value across all 15 years on record.
The figure is unchanged over ten years.
Over the whole period, dealing with construction permits: time in Eswatini peaked at 116 days in 2005 and was at its lowest, 116 days, in 2005.
That places Eswatini 118th out of 185 countries with data for 2019, putting it in the middle of the range.
Averages by decade
| Decade | Average | Lowest | Highest | Years |
|---|---|---|---|---|
| 2000s | 116 days | 116 days | 116 days | 5 |
| 2010s | 116 days | 116 days | 116 days | 10 |
Countries ranked near Eswatini
More private sector data for Eswatini
- Merchandise trade 86.4% (2025)
- Food imports 19.6% (2023)
- Manufactures imports 58.1% (2023)
- Merchandise imports 2.09 billion current US$ (2025)
- Food exports 29.7% (2023)
- Manufactures exports 59.8% (2023)
- Merchandise exports 2.37 billion current US$ (2025)
- Commercial service exports 232.50 million current US$ (2024)
- Transport services 10.9% (2024)
- Computer, communications and other services 80.7% (2024)
Frequently asked questions
- What is dealing with construction permits: time in Eswatini?
- Dealing with construction permits: time in Eswatini was 116 days in 2019, according to the World Bank.
- What is the highest dealing with construction permits: time recorded in Eswatini?
- The highest recorded value was 116 days in 2005.
- What is the lowest dealing with construction permits: time recorded in Eswatini?
- The lowest recorded value was 116 days in 2005.
- How does Eswatini rank for dealing with construction permits: time?
- Eswatini ranks 118th out of 185 countries with data for 2019.
- Is dealing with construction permits: time rising or falling in Eswatini?
- Over the last ten years it is unchanged. The long-run trend across the full record is flat.
- Where does this Eswatini data come from?
- The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.
Download this data
CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).
About this data
The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.