Dealing with construction permits: Time in Eswatini

Eswatini: Dealing with construction permits: Time was 116 days in 2019. ▬ Flat

Latest (2019)
116 days
Change on year
unchanged
World rank
118th
of 185 countries
All-time high
116 days
in 2005
All-time low
116 days
in 2005
Years of data
15
2005–2019

Dealing with construction permits: Time in Eswatini, 2005–2019

02550751001252005201220192005: 116 days2006: 116 days2007: 116 days2008: 116 days2009: 116 days2010: 116 days2011: 116 days2012: 116 days2013: 116 days2014: 116 days2015: 116 days2016: 116 days2017: 116 days2018: 116 days2019: 116 days

Source: World Bank. Measured in days.

Analysis

In 2019, dealing with construction permits: time in Eswatini stood at 116 days. That is the highest value across all 15 years on record.

The figure is unchanged over ten years.

Over the whole period, dealing with construction permits: time in Eswatini peaked at 116 days in 2005 and was at its lowest, 116 days, in 2005.

That places Eswatini 118th out of 185 countries with data for 2019, putting it in the middle of the range.

Averages by decade

DecadeAverage LowestHighest Years
2000s 116 days 116 days 116 days 5
2010s 116 days 116 days 116 days 10

Countries ranked near Eswatini

  1. 115 Mozambique 118 days compare
  2. 115 Nepal 118 days compare
  3. 117 Sweden 117 days compare
  4. 118 Azerbaijan 116 days compare
  5. 118 St. Lucia 116 days compare
  6. 121 Seychelles 113 days compare
  7. 121 Thailand 113 days compare
  8. 121 Uganda 113 days compare

See the full ranking of 187 places →

More private sector data for Eswatini

All data for Eswatini →

Frequently asked questions

What is dealing with construction permits: time in Eswatini?
Dealing with construction permits: time in Eswatini was 116 days in 2019, according to the World Bank.
What is the highest dealing with construction permits: time recorded in Eswatini?
The highest recorded value was 116 days in 2005.
What is the lowest dealing with construction permits: time recorded in Eswatini?
The lowest recorded value was 116 days in 2005.
How does Eswatini rank for dealing with construction permits: time?
Eswatini ranks 118th out of 185 countries with data for 2019.
Is dealing with construction permits: time rising or falling in Eswatini?
Over the last ten years it is unchanged. The long-run trend across the full record is flat.
Where does this Eswatini data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.