Fiji vs Maldives: Dealing with construction permits: Time
Dealing with construction permits: Time over time
- Fiji
- Maldives
How they compare
Fiji currently reports 141 days against 140 days in Maldives, a difference of 1 days.
The two have swapped places 1 time across 15 shared years of data; in 2005 it was Maldives ahead.
Fiji ranks 89th and Maldives ranks 91st of 185 countries.
Across the 2 decades both report, Fiji averaged higher in 1 and Maldives in 1.
Head to head by decade
| Decade | Fiji | Maldives | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 137.4 days | 140 days | 2.6 days | Maldives |
| 2010s | 141 days | 140 days | 1 days | Fiji |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher dealing with construction permits: time, Fiji or Maldives?
- Fiji, at 141 days against 140 days in Maldives as of 2019.
- What is the difference in dealing with construction permits: time between Fiji and Maldives?
- 1 days, with Fiji ahead.
- How many years of comparable data are there for Fiji and Maldives?
- 15 years are reported by both, from 2005 to 2019.
- How do Fiji and Maldives rank globally for dealing with construction permits: time?
- Fiji ranks 89th and Maldives ranks 91st of 185 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.