Gabon vs Lebanon: Dealing with construction permits: Time

Gabon
275 days
in 2019
Lebanon
276 days
in 2019
Gabon rank
12th
Lebanon rank
11th

Dealing with construction permits: Time over time

  • Gabon
  • Lebanon
0100200300200520122019

How they compare

Lebanon currently reports 276 days against 275 days in Gabon, a difference of 1 days.

The two have swapped places 3 times across 15 shared years of data; in 2005 it was Gabon ahead.

Gabon ranks 12th and Lebanon ranks 11th of 185 countries.

Across the 2 decades both report, Gabon averaged higher in 1 and Lebanon in 1.

Head to head by decade

Decade Gabon Lebanon Difference Ahead
2000s 280 days 273 days 7 days Gabon
2010s 275 days 275.1 days 0.1 days Lebanon

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Gabon or Lebanon?
Lebanon, at 276 days against 275 days in Gabon as of 2019.
What is the difference in dealing with construction permits: time between Gabon and Lebanon?
1 days, with Lebanon ahead.
How many years of comparable data are there for Gabon and Lebanon?
15 years are reported by both, from 2005 to 2019.
How do Gabon and Lebanon rank globally for dealing with construction permits: time?
Gabon ranks 12th and Lebanon ranks 11th of 185 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.