Dealing with construction permits: Time in Lebanon

Lebanon: Dealing with construction permits: Time was 276 days in 2019. ▬ Flat

Latest (2019)
276 days
Change on year
unchanged
World rank
11th
of 185 countries
All-time high
276 days
in 2013
All-time low
273 days
in 2005
Years of data
15
2005–2019

Dealing with construction permits: Time in Lebanon, 2005–2019

01002003002005201220192005: 273 days2006: 273 days2007: 273 days2008: 273 days2009: 273 days2010: 273 days2011: 273 days2012: 273 days2013: 276 days2014: 276 days2015: 276 days2016: 276 days2017: 276 days2018: 276 days2019: 276 days

Source: World Bank. Measured in days.

Analysis

The most recent figure for dealing with construction permits: time in Lebanon is 276 days, measured in 2019. That is the highest value across all 15 years on record.

Compared with earlier readings it is up 1.1% over ten years.

Over the whole period, dealing with construction permits: time in Lebanon peaked at 276 days in 2013 and was at its lowest, 273 days, in 2005.

Lebanon ranks 11th of 185 countries on this measure, in the top 10%.

Averages by decade

DecadeAverage LowestHighest Years
2000s 273 days 273 days 273 days 5
2010s 275.1 days 273 days 276 days 10

Countries ranked near Lebanon

  1. 8 El Salvador 310 days compare
  2. 9 Slovakia 300 days compare
  3. 10 Moldova 278 days compare
  4. 12 Gabon 275 days compare
  5. 13 Bangladesh 273.52 days compare
  6. 14 Uruguay 265 days compare

See the full ranking of 187 places →

More private sector data for Lebanon

All data for Lebanon →

Frequently asked questions

What is dealing with construction permits: time in Lebanon?
Dealing with construction permits: time in Lebanon was 276 days in 2019, according to the World Bank.
What is the highest dealing with construction permits: time recorded in Lebanon?
The highest recorded value was 276 days in 2013.
What is the lowest dealing with construction permits: time recorded in Lebanon?
The lowest recorded value was 273 days in 2005.
How does Lebanon rank for dealing with construction permits: time?
Lebanon ranks 11th out of 185 countries with data for 2019.
Is dealing with construction permits: time rising or falling in Lebanon?
Over the last ten years it is up 1.1%. The long-run trend across the full record is flat.
Where does this Lebanon data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.