Gambia, The vs Malta: Dealing with construction permits: Time

Gambia, The
173 days
in 2019
Malta
179 days
in 2019
Gambia, The rank
57th
Malta rank
54th

Dealing with construction permits: Time over time

  • Gambia, The
  • Malta
050100150200200520122019

How they compare

Malta currently reports 179 days against 173 days in Gambia, The, a difference of 6 days.

The two have swapped places 1 time across 9 shared years of data; in 2011 it was Gambia, The ahead.

Gambia, The ranks 57th and Malta ranks 54th of 185 countries.

Malta has averaged higher in every one of the 1 decades both report.

Frequently asked questions

Which has higher dealing with construction permits: time, Gambia, The or Malta?
Malta, at 179 days against 173 days in Gambia, The as of 2019.
What is the difference in dealing with construction permits: time between Gambia, The and Malta?
6 days, with Malta ahead.
How many years of comparable data are there for Gambia, The and Malta?
9 years are reported by both, from 2011 to 2019.
How do Gambia, The and Malta rank globally for dealing with construction permits: time?
Gambia, The ranks 57th and Malta ranks 54th of 185 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.