Dealing with construction permits: Time in Gambia, The

Gambia, The: Dealing with construction permits: Time was 173 days in 2019. ▬ Flat

Latest (2019)
173 days
Change on year
unchanged
World rank
57th
of 185 countries
All-time high
173 days
in 2010
All-time low
172 days
in 2005
Years of data
15
2005–2019

Dealing with construction permits: Time in Gambia, The, 2005–2019

0501001502005201220192005: 172 days2006: 172 days2007: 172 days2008: 172 days2009: 172 days2010: 173 days2011: 173 days2012: 173 days2013: 173 days2014: 173 days2015: 173 days2016: 173 days2017: 173 days2018: 173 days2019: 173 days

Source: World Bank. Measured in days.

Analysis

The most recent figure for dealing with construction permits: time in Gambia, The is 173 days, measured in 2019. That is the highest value across all 15 years on record.

That represents a change of up 0.6% over ten years.

Over the whole period, dealing with construction permits: time in Gambia, The peaked at 173 days in 2010 and was at its lowest, 172 days, in 2005.

Gambia, The ranks 57th of 185 countries on this measure, in the middle of the range.

Averages by decade

DecadeAverage LowestHighest Years
2000s 172 days 172 days 172 days 5
2010s 173 days 173 days 173 days 10

Countries ranked near Gambia, The

  1. 54 Malta 179 days compare
  2. 55 Zimbabwe 178 days compare
  3. 56 Senegal 177 days compare
  4. 57 Egypt, Arab Rep. 173 days compare
  5. 59 Ghana 170 days compare
  6. 60 Togo 168.5 days compare

See the full ranking of 187 places →

More private sector data for Gambia, The

All data for Gambia, The →

Frequently asked questions

What is dealing with construction permits: time in Gambia, The?
Dealing with construction permits: time in Gambia, The was 173 days in 2019, according to the World Bank.
What is the highest dealing with construction permits: time recorded in Gambia, The?
The highest recorded value was 173 days in 2010.
What is the lowest dealing with construction permits: time recorded in Gambia, The?
The lowest recorded value was 172 days in 2005.
How does Gambia, The rank for dealing with construction permits: time?
Gambia, The ranks 57th out of 185 countries with data for 2019.
Is dealing with construction permits: time rising or falling in Gambia, The?
Over the last ten years it is up 0.6%. The long-run trend across the full record is flat.
Where does this Gambia, The data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.