Gambia vs Zimbabwe: Dealing with construction permits: Time (days) (Time days)

Gambia
173 days
in 2019
Zimbabwe
178 days
in 2019
Gambia rank
59th
Zimbabwe rank
57th

Dealing with construction permits: Time (days) (Time days) over time

  • Gambia
  • Zimbabwe
200300400500600200520122019

How they compare

Zimbabwe currently reports 178 days against 173 days in Gambia, a difference of 5 days.

Across all 15 years both countries report, Zimbabwe has been ahead every year.

Gambia ranks 59th and Zimbabwe ranks 57th of 188 countries.

Zimbabwe has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Gambia Zimbabwe Difference Ahead
2000s 172 days 421.4 days 249.4 days Zimbabwe
2010s 173 days 390.4 days 217.4 days Zimbabwe

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Gambia or Zimbabwe?
Zimbabwe, at 178 days against 173 days in Gambia as of 2019.
What is the difference in dealing with construction permits: time between Gambia and Zimbabwe?
5 days, with Zimbabwe ahead.
How many years of comparable data are there for Gambia and Zimbabwe?
15 years are reported by both, from 2005 to 2019.
How do Gambia and Zimbabwe rank globally for dealing with construction permits: time?
Gambia ranks 59th and Zimbabwe ranks 57th of 188 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Gambia vs Zimbabwe: Dealing with construction permits: Time. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-time-days/gambia-the/zimbabwe/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-time-days/gambia-the/zimbabwe/">Gambia vs Zimbabwe: Dealing with construction permits: Time</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.