Dealing with construction permits: Time in Zimbabwe
Zimbabwe: Dealing with construction permits: Time was 178 days in 2019. ▼ Falling
Dealing with construction permits: Time in Zimbabwe, 2005–2019
Source: World Bank. Measured in days.
Analysis
In 2019, dealing with construction permits: time in Zimbabwe stood at 178 days. That is the lowest value across all 15 years on record.
The figure is down 14.4% on the previous year and down 68.6% over ten years.
Over the whole period, dealing with construction permits: time in Zimbabwe peaked at 566 days in 2008 and was at its lowest, 178 days, in 2019.
That places Zimbabwe 55th out of 185 countries with data for 2019, putting it in the middle of the range.
The long-run direction has been consistently falling across the 15 years of available data.
Averages by decade
| Decade | Average | Lowest | Highest | Years |
|---|---|---|---|---|
| 2000s | 421.4 days | 266 days | 566 days | 5 |
| 2010s | 390.4 days | 178 days | 566 days | 10 |
Countries ranked near Zimbabwe
- 54 Malta 179 days compare
- 56 Senegal 177 days compare
- 57 Egypt, Arab Rep. 173 days compare
- 57 Gambia, The 173 days compare
More private sector data for Zimbabwe
- Merchandise trade 38.7% (2025)
- Food imports 19.0% (2024)
- Manufactures imports 58.3% (2024)
- Merchandise imports 10.11 billion current US$ (2025)
- Food exports 21.6% (2024)
- Manufactures exports 6.7% (2024)
- Merchandise exports 9.71 billion current US$ (2025)
- Commercial service exports 438.49 million current US$ (2024)
- Transport services 34.1% (2024)
- Computer, communications and other services 37.1% (2024)
Frequently asked questions
- What is dealing with construction permits: time in Zimbabwe?
- Dealing with construction permits: time in Zimbabwe was 178 days in 2019, according to the World Bank.
- What is the highest dealing with construction permits: time recorded in Zimbabwe?
- The highest recorded value was 566 days in 2008.
- What is the lowest dealing with construction permits: time recorded in Zimbabwe?
- The lowest recorded value was 178 days in 2019.
- How does Zimbabwe rank for dealing with construction permits: time?
- Zimbabwe ranks 55th out of 185 countries with data for 2019.
- Is dealing with construction permits: time rising or falling in Zimbabwe?
- Over the last ten years it is down 68.6%. The long-run trend across the full record is falling.
- Where does this Zimbabwe data come from?
- The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.
Download this data
CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).
About this data
The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.