Dealing with construction permits: Time in Zimbabwe

Zimbabwe: Dealing with construction permits: Time was 178 days in 2019. ▼ Falling

Latest (2019)
178 days
Change on year
down 14.4%
World rank
55th
of 185 countries
All-time high
566 days
in 2008
All-time low
178 days
in 2019
Years of data
15
2005–2019

Dealing with construction permits: Time in Zimbabwe, 2005–2019

2003004005006002005201220192005: 266 days2006: 266 days2007: 443 days2008: 566 days2009: 566 days2010: 566 days2011: 566 days2012: 566 days2013: 448 days2014: 448 days2015: 448 days2016: 238 days2017: 238 days2018: 208 days2019: 178 days

Source: World Bank. Measured in days.

Analysis

In 2019, dealing with construction permits: time in Zimbabwe stood at 178 days. That is the lowest value across all 15 years on record.

The figure is down 14.4% on the previous year and down 68.6% over ten years.

Over the whole period, dealing with construction permits: time in Zimbabwe peaked at 566 days in 2008 and was at its lowest, 178 days, in 2019.

That places Zimbabwe 55th out of 185 countries with data for 2019, putting it in the middle of the range.

The long-run direction has been consistently falling across the 15 years of available data.

Averages by decade

DecadeAverage LowestHighest Years
2000s 421.4 days 266 days 566 days 5
2010s 390.4 days 178 days 566 days 10

Countries ranked near Zimbabwe

  1. 54 Malta 179 days compare
  2. 56 Senegal 177 days compare
  3. 57 Egypt, Arab Rep. 173 days compare
  4. 57 Gambia, The 173 days compare

See the full ranking of 187 places →

More private sector data for Zimbabwe

All data for Zimbabwe →

Frequently asked questions

What is dealing with construction permits: time in Zimbabwe?
Dealing with construction permits: time in Zimbabwe was 178 days in 2019, according to the World Bank.
What is the highest dealing with construction permits: time recorded in Zimbabwe?
The highest recorded value was 566 days in 2008.
What is the lowest dealing with construction permits: time recorded in Zimbabwe?
The lowest recorded value was 178 days in 2019.
How does Zimbabwe rank for dealing with construction permits: time?
Zimbabwe ranks 55th out of 185 countries with data for 2019.
Is dealing with construction permits: time rising or falling in Zimbabwe?
Over the last ten years it is down 68.6%. The long-run trend across the full record is falling.
Where does this Zimbabwe data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.