Georgia vs Morocco: Dealing with construction permits: Time
Dealing with construction permits: Time over time
- Georgia
- Morocco
How they compare
Georgia currently reports 63 days against 58 days in Morocco, a difference of 5 days.
That makes Georgia's figure about 1.1 times Morocco's.
The two have swapped places 4 times across 15 shared years of data; in 2005 it was Georgia ahead.
Georgia ranks 178th and Morocco ranks 179th of 185 countries.
Georgia has averaged higher in every one of the 2 decades both report.
Head to head by decade
| Decade | Georgia | Morocco | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 135.3 days | 109 days | 26.3 days | Georgia |
| 2010s | 68.65 days | 64.2 days | 4.45 days | Georgia |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher dealing with construction permits: time, Georgia or Morocco?
- Georgia, at 63 days against 58 days in Morocco as of 2019.
- What is the difference in dealing with construction permits: time between Georgia and Morocco?
- 5 days, with Georgia ahead.
- How many years of comparable data are there for Georgia and Morocco?
- 15 years are reported by both, from 2005 to 2019.
- How do Georgia and Morocco rank globally for dealing with construction permits: time?
- Georgia ranks 178th and Morocco ranks 179th of 185 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.