Georgia vs Samoa: Dealing with construction permits: Time (days) (Time days)

Georgia
63 days
in 2019
Samoa
57 days
in 2019
Georgia rank
181st
Samoa rank
183rd

Dealing with construction permits: Time (days) (Time days) over time

  • Georgia
  • Samoa
50100150200200520122019

How they compare

Georgia currently reports 63 days against 57 days in Samoa, a difference of 6 days.

That makes Georgia's figure about 1.1 times Samoa's.

Across all 15 years both countries report, Georgia has been ahead every year.

Georgia ranks 181st and Samoa ranks 183rd of 188 countries.

Georgia has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Georgia Samoa Difference Ahead
2000s 135.3 days 57 days 78.3 days Georgia
2010s 68.65 days 57 days 11.65 days Georgia

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Georgia or Samoa?
Georgia, at 63 days against 57 days in Samoa as of 2019.
What is the difference in dealing with construction permits: time between Georgia and Samoa?
6 days, with Georgia ahead.
How many years of comparable data are there for Georgia and Samoa?
15 years are reported by both, from 2005 to 2019.
How do Georgia and Samoa rank globally for dealing with construction permits: time?
Georgia ranks 181st and Samoa ranks 183rd of 188 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Georgia vs Samoa: Dealing with construction permits: Time. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-time-days/georgia/samoa/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-time-days/georgia/samoa/">Georgia vs Samoa: Dealing with construction permits: Time</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.